China Railway Eryuan Engineering Group Co. Ltd.Investigation Report of Futian Station of Shenzhen 3th Line[R]. Chengdu: China Railway Eryuan Engineering Group Co. Ltd,2008.
[2] 杨锡斌. 预应力锚索框架梁施工质量控制要点[J]. 铁道工程学报,2007( S1) : 325 - 329.
Yang Xibin. Quality Points for Anchor Prestressed Girder Framework[J]. Journal of Railway Engineering Society,2007( S1) : 325 - 329.
[3] 尤春安. 预应力锚索锚固段的应力分布规律及分析[J].岩石力学与工程学报,2005( 6) : 925 - 929.
You Chunan. Distributing Characters and Analysis of Stresses in Prestressed Cables[J]. Chinese Journal of Rock Mechanics and Engineering,2005( 6) : 925 - 929.
[4] 范宇洁. 预应力锚索锚固体的破坏机理和极限承载能力研究[J]. 岩石力学与工程学报,2005( 15) : 2765 - 2769.
Fan Yujie. Research on Failure Mechanism and Ultimate Load Carrying Capacity of Prestressed Cable[J].Chinese Journal of Rock Mechanics and Engineering,2005( 15) : 2765 - 2769.
[5] GB/T 5224—2003 预应力混凝土用钢绞线[S].
GB/T 5224—2003,Steel Strand for Prestressed Concrete[S].
[6] CECS22: 90,土层锚杆设计与施工规范[S].
CECS22: 90,Code for Desing and Construction of Soil Anchors[S].
[7] 王立. 高边坡锚杆( 索) 病害整治[J]. 铁道工程学报.2006( S1) : 498 - 499.
Wang Li. The Estimation of Influence of Fractrue Structures on the Building Engineering Sites [J].Journal of Railway Engineering Society,2006 ( S1 ) :498 - 499.
[8] GB 50007—2002,建筑地基基础设计规范[S].
GB 50007—2002, Code for Design of Building Foundation[S].