The Fourth Survey & Design Institute of China Railway. Technological Handbook of Railway Engineering Design, Station and Terminal [K].Beijing: China Railway Publishing House,2004.
[4] 辛灵. 客运专线引入枢纽相关问题研究[D]. 成都: 西南交通大学, 2008.
Xin Ling. Research on the Relevant Issues of PDL into Terminal [ D ]. Chengdu: Southwest Jiaotong University,2008.
[5] 彭文盛,彭辉. 高速铁路引入既有枢纽客运站的布局[J]. 交通运输工程学报, 2004( 2) : 62 - 65
Peng Wensheng,Peng Hui. Layout for Leading PDL into the Passenger Station of the Existing Terminal [J].Journal of Traffic and Transportation Engineering, 2004( 2) : 62 - 65.
[6] 廖天武. 客运专线引入铁路枢纽的关键问题研究[D].成都: 西南交通大学, 2008.
Liao Tianwu. Research on the Key Issues for Leading PDL into Railway Terminal [D]. Chengdu: Southwest Jiaotong University,2008.
[7] 李冰. 客运专线引入铁路枢纽的方案评价[J]. 铁道运输与经济, 2007( 3) : 88 - 91.
Li Bing. Scheme Evaluation for Leading PDL into Railway Terminal [J ]. Railway Transport and Economy,2007( 3) : 88 - 91.
[8] 王南. 高速客运站设置的系统优化研究[D]. 成都: 西南交通大学, 2008.
Wang Nan. Research on Systematic Optimum of High Speed Railway Station Setting [D]. Chengdu:Southwest Jiaotong University,2008.
[9] 左武,赵升. 郑徐客运专线引入徐州枢纽方案研究[J].铁道工程学报, 2010( 12) : 5 - 8.
Zuo Wu,Zhao Sheng. Research on Schemes of Leading Zhengzhou - Xuzhou Passenger Dedicated Line into Xuzhou Terminal[J]. Journal of Railway Engineering Society,2010( 12) : 5 - 8.