Qing Sanhui. Research on the Key Construction Equipments and Technologies for CRTS Ⅱ Slab Ballastless Track for High - speed Railway[J]. Journal of Railway Engineering, 2008( 7) : 22 - 26.
[6] 闫红亮. 客运专线轨道结构选型研究[J]. 铁道建筑,2005( 2) : 26 - 28.
Yan Hongliang. Research on Track Structure of Passenger Dedicated Line & Structure’s Selection[J].Rail Engineering, 2005( 2) : 26 - 28.
[7] 寇胜宇. 京津城际铁路岔区板式无砟轨道结构设计[J].铁道建筑, 2008( 增刊) : 22 - 25.
Kou Shengyu. Design for Slab of Turnout Area of Beijing - Tianjin Intercity Line[J]. Rail Engineering,2008( Supplement) : 22 - 25.
[8] 丁水霖. 高速铁路道岔铺设[J]. 上海铁道科技,2008( 3) : 75 - 77.
Ding Shuilin. High Speed Railway Switch Laying [J].Shanghai Railway Sciences &Technology,2008 ( 3 ) :75 - 77.