Analysis of Mechanism of Water Leakage Induced by Longitudinal Uneven Settlement of Shield Tunnel |
LIU Yin,ZHANG Dong - mei,HUANG Hong - wei |
Tongji University,Shanghai 200092,China |
|
|
Abstract Research purposes: As the lining of the metro shield tunnel is commonly assembled of the jointed segmental precast concretes,during the operation of the subway,the longitudinal uneven settlements will happen due to various factors,resulting in enlarging the joint opening of the adjacent segments to cause water leaking between adjacent segments. It is necessary to analyze and research the mechanism of the water leakage of the shield tunnel.
Research conclusions: The longitudinal uneven settlement of the tunnel will make opening of the circumferential seam and weaken the property of the water resistance of the elastic gasket,resulting in water leaking between segments. The long coefficient influenced by the circumferential joints produces little impact on circumferential seam while the stiffness ratio of the different circumferential width and different bolts with the concrete will produce a certain impact on the opening of the circumferential seam. The big stiffness ratio of the circumferential width and bolts with the concrete is not good for the waterproofing of the joint segments. This research can provide the reference to the waterproofing design and maintenance of the tunnel.
|
Received: 25 April 2011
|
|
|
|
|
[1] 黄宏伟,陈龙,胡群芳,等. 隧道及地下工程的全寿命风险管理[M]. 北京: 科学出版社,2010.
Huang Hongwei,Chen Long,Hu Qunfang. Life - cycle Risk Management of Tunnel and Underground Engineering[M]. Beijing: China Science Press: Beijing, 2010.
[2] 袁勇,赵庆丽. 盾构隧道衬砌截面的承载能力功能函数[J]. 铁道工程学报,2009( 5) : 59 -63.
Yuan Yong,Zhao Qingli. Functions for the Bearing Capacity of Lining Cross - Section of Shield Tunnel[J]. Journal of Railway Engineering Society,2009 ( 5) : 59 - 63.
[3] 刘建航,侯学渊. 盾构法隧道[M]. 北京: 中国铁道出版社,1991.
Liu Jianhang,Hou Xueyuan. Shield - driven Tunnels [M]. Beijing: China Railway Publishing House,1991.
[4] 张冬梅,等. 衬砌局部渗流对软土隧道地表长期沉降的影响研究[J]. 岩土工程学报,2005( 12) : 1430 -1436.
Zhang Dongmei,etc. Influence of Partial Drainage of Linings on Long - term Surface Settlement Over Tunnels in Soft Soil [J ]. Chinese Journal of Geotechnical Engineering,2005( 12) : 1430 - 1436.
[5] 刘正根. 沉管隧道接头性态与安全评估[D]. 上海: 同济大学,2009.
Liu Zhenggen. The Behavior and Safety Assessment of Immersed Tube Tunnel Joint[D]. Shanghai: Tongji University,2009.
[6] 伍振志. 越江盾构隧道耐久性若干关键问题研究[D].上海: 同济大学,2007.
Wu Zhenzhi. Study on Some Key Problem on the Durability of Shield Tunnel under River[D]. Shanghai: Tongji University,2007.
[7] 上海市建设委员会科学技术委员会. 地铁一号线工程[M]. 上海: 上海科学技术出版社,1998.
Science and Technology Committee of Shanghai Municipal Construction Commission. Shanghai Metro - Line 1 [M ]. Shanghai: Shanghai Scientific and Technical Publishers,1998.
[8] H. Murakanu and A. Koiumi. Study of Load - bearing Capacity and Mechanics of Shield Segment Ring[J]. In Proceedings of JSCE,1978.
[9] S. M. Liao and F. L. Peng. Analysis of Shearing Effect on Tunnel Induced by Load Transfer along Longitudinal Direction [J]. Tunnelling and Underground Space Technology,2008: 241 - 430.
[10] 周宁,袁勇. 越江盾构隧道纵向变形曲率与管环渗漏的关系[J]. 同济大学学报( 自然科学版) ,2009( 11) : 1446 - 1451.
Zhou Ning,Yuan Yong. Correlation of Cross - river Shield Tunnel between Longitudinal Deformation Curvature and Segment Leakage[J]. Journal of Tongji University( natural scinence) ,2009( 11) : 1446 - 1451.
[11] 廖少明. 圆形隧道纵向剪切传递效应研究[D]. 上海: 同济大学,2002.
Liao Shaoming. Research on the Effect of Longitudinal Shear Transfer on Circular Tunnel Lining [D]. Shanghai: Tongji University,2002.
[12] 徐凌. 软土盾构隧道纵向沉降研究[D]. 上海: 同济大学. 2005.
Xu Ling. Study on the Longitudinal Settlement of Shield Tunnel in Soft Soil[D]. Shanghai: Tongji University,2005.
|
|
|
|