Experimental Analysis of Long - term Stability of Soaking Subgrade for High Speed Railway |
CHEN Shang - yong,SUN Hong - lin |
China Railway Siyuan Survey and Design Group Co. Ltd,Wuhan,Hubei 430063,China |
|
|
Abstract Research purposes: Compared with general subgrade,the long - term stability of soaking subgrade would be threatened when it suffered flow impact,scour,erosion,water softening of the roadbed fill,adverse effects of water level change and cyclical loading by train. So a dynamic experiment system is built to study the behavior of soaking subgrade under cyclical loading by train for high speed railway. Then,some testing indexes containing subgrade dynamic stress, elastic deformation,plastic deformation,dynamic pore water pressure,the natural frequency and so on are analyzed. At last,the long - term stability of the soaking subgrade is evaluated and the reliability and reasonableness of the design scheme is verified.
Research conclusions: A dynamic test system is established according to the loading boundary conditions of soaking subgrade paved with CRTS II slab ballastless track for a top speed of 350 km / h. After 5. 5 million times dynamic loading of 9 ~ 13 kPa,the dynamic stress,the dynamic pore pressure and the elastic deformations of the roadbed are in stable states,and the plastic deformation is 0. 48 ~ 0. 56 mm. The results of the sweeping frequency test indicate that the resonance will not happen as the natural vibration frequency of the subgrade is more than train 's dynamic loading frequency and the subgrade keep good performance because the natural vibration frequency decreases less after the dynamic test. The design of the experiment about soaking subgrade protection and filling is feasible. The long - term soaking subgrade has stable performance and can meet the strength and deformation requirements of the roadbed with ballastless track.
|
Received: 01 July 2011
|
|
|
|
|
[1] TB 10621—2009,高速铁路设计规范( 试行) [S].
TB 10621—2009,Code for Design of High Speed Railway[S].
[2] TB 10001—2005,铁路路基设计规范[S].
TB 10001—2005,Code for Design on Subgrade of Railway[S].
[3] 顾湘生. 客运专线路基工程几个问题的讨论[J]. 铁道工程学报,2005( 1) : 31 -38.
Gu Xiangsheng. Discussion on Some Issues in Construction of Subgrade of Passenger Dedicated Line [J]. Journal of Railway Engineering Society,2005( 1) : 31 - 38.
[4] 朱忠林,马伟斌,韩自力. 新建铁路路基改良土动力学试验研究[J]. 中国铁路,2007( 5) : 51 -53.
Zhu Zhonglin, Ma Weibin, Han Zili. Experimental Study on Dynamic Characteristics of Improved Soil in New Railway Subgrade[J]. Chinese Railway,2007( 5) : 51 - 53.
[5] 朱忠林,马伟斌,史存林. 合宁线试验段路堑基床地基动力特性试验研究[J]. 铁道建筑,2007( 2) : 55 -58.
Zhu zhonglin, Maweibin, Shi Cunlin. Experimental Study on Dynamic Characteristics of Cutting Roadbed in He - Ning Railway Test Section [J]. Railway Engneering,2007( 2) : 55 - 58.
[6] 郑大为,王炳龙,周顺华,等. 合宁快速客运专线膨胀土不同刚度路堤振动特性研究[J]. 岩石力学与工程学报, 2006( S2) : 4204 - 4208.
Zheng Dawei, Wang Binglong, Zhou Shunhua etc. Study on Vibration Character of Expansive Soil Embankments with Different Rigidities Along Hefei - Nanjing Rapid Railway[J]. Chinese Journal of Rock Mechanics and Engineering,2006( S2) : 4204 - 4208.
[7] 孙红林,李丹. 京沪高速铁路路基工程主要技术标准研究[J]. 铁道建筑,2009( 7) : 5 -10.
Sun Honglin, Li Dan. Mainly Technical Standard Research on The Beijing - Shanghai High - Speed Railway Subgrade Engineering[J]. Railway Engneering, 2009( 7) : 5 - 10.
[8] 李丹. 京沪高速铁路徐沪段路基填料利用方案研究[J].高速铁路技术,2010( 1) : 54 -56.
Li Dan. One Plan of Utilizable Subgrade Filling in Xuzhou - Shanghai Section of Beijing - Shanghai High - Speed Railway. High - Speed Railway Technology[J]. 2010( 1) : 54 - 56.
[9] A. Gomes Correia, Heinz Brandl. Geotechnics for Roads, Rail Tracks and Earth Structures [M]. Netherlands: A. A. Balkema,2001.
|
|
|
|