|
|
Risk Analysis and Countermeasures on Stage of Large Span Self - anchored Suspension Bridge Construction |
LI Tao1,ZHANG Fu - yang2 |
1. China Railway Shanghai Design Institute Group Co. Ltd,Shanghai 200070,China; 2. Changan University,Xi'an,Shanxi,710061,China |
|
|
Abstract Research purposes: All risks existing design and construction were recognized on design scheme of main bridge of Yangmeizhou bridge and structure system innovation using engineering risk assessment method and main risk factors were put forward. According to risk occurrence probability and risk loss,grade judgment of bridge risks was given. At last,preventive measures to reduce and control risk were proposed.
Research conclusions: Four items of main risk factors were showed in this design by risk identification,namely?structure system innovation risk of Long - span Self - anchored Suspension Bridges,adverse weather condition risk on construction safety,? box beam? multiple points incremental launching construction risk on deformation and stability,boats accidental collision risk on temporary piers during construction. According to risk occurrence probability and risk loss, the whole risk level belongs to the second grade,which could be accepted,and preventive measures should been put into implement to promote the safety of bridge construction.
|
Received: 20 October 2011
|
|
|
|
|
[1] 张喜刚,等. 公路桥梁和隧道工程设计安全风险评估[M]. 北京: 人民交通出版社, 2010.
Zhang xigang,etc. Risk Assessment for Safety of Rodad Bridge and Tunnel Design [M]. Beijing: China Communication Press, 2010.
[2] 孟宪魁. PDCA 风险管理在工程施工中的应用[J]. 铁道工程学报,2006 ( 4) : 101 - 104.
Meng xiankui,Application of PDCA Risk Management in Construction[J]. Journal of Railway Engneering Society ,2006( 4) : 101 - 104.
[3] 穆祥纯. 城市桥梁风险评价的案例分析及对策研究[J].城市道桥与防洪,2008( 10) : 9 - 14.
Mu Xiangchun. Case Analysis and Countermeasure Study of Urban Bridge Risk Evaluation[J]. Urban Road Bridge & Flood Control,2008( 10) : 9 - 14.
[4] 张凤华. 桥梁风险评估方法与发展研究[J]. 城市道桥与防洪,2007( 5) 164 - 167.
Zhang Fenghua. Appraisal Method and Development Research of Bridge Risk [J]. Urban Road Bridge &Flood Control,2007( 5) : 164 - 167.
[5] 吴海林,徐剑. 船舶撞击桥梁风险评估[J]. 山西建筑,2009( 18) : 299 - 300.
Wu Hailin, Xu Jian. Risk Assessment for Vessel Impacts on Bridge [J]. Shanxi Architecture, 2009( 18) :299 - 300.
[6] 姜华,王君杰. 美国公路桥梁风险法确定设防船撞力评述[J]. 世界桥梁, 2008( 4) : 64 - 67.
Jiang Hua,Wang Junjie. Comments on Vessel Collision Force Protection for American Highway Bridges Determined According to Risk Method [J]. World Bridge,2008( 4) : 64 - 67.
[7] 王增忠,王君杰,范立础. 船撞桥风险评估与管理,自然灾害学报[J]. 2008( 4) : 7 - 11.
Wang Zengzhong, Wang Junjie, Fan Lichu. Risk Assessment and Administration of Vessel Collision with Bridge [J]. Journal of Natrual Disasters, 2008( 4) : 7 -11.
|
|
|
|