|
|
Study on Track Alignment in Huangguoshu - Beipanjiang Section of Shanghai-Kunming Passenger Dedicated Line |
MAO Bang - yan,WU Jun - meng,YU Hong - ping,TANG Bing |
MAO Bang - yan,WU Jun - meng,YU Hong - ping,TANG Bing |
|
|
Abstract Research purposes: The Huangguoshu - Beipanjiang section of the Shanghai - Kunming Passenger Dedicated Line is located in the mountain area deeply cut by Baling River and Beipan River in Kediya,with the complex terrain and geological conditions. The railway alignment is seriously restricted by the geological conditions.Therefore,the study on the railway alignment not only can avoid the hidden trouble of the engineering safety as much as possible when railway passes through the high gas formations,the dense goaf and the stratum with serious development of karst,but also can provide the reference to the high - speed railway alignment in the area with the same or similar geological conditions.
Research conclusions: Through the deep investigation and analysis of the environmental geological conditions and the main engineering geological problems of each alignment scheme,the GRC mathematical model was established to evaluate the alignment,and the evaluating index system and their weights for the geological alignment were offered. With GRC model,the optional schemes of CK,C4K and C19K were evaluated and their scores were respectively 73. 3,74. 3 and 73. 5. So the CK scheme was the final one. With this scheme,the railway keeps away from the unfavorable geological areas of landslide,scatter,collapse and mining area as well as the karst area with serious development.
|
Received: 15 May 2011
|
|
|
|
|
[1] 喻洪平,张春祥,徐学渊,等. 新建铁路沪昆客运专线长沙至昆明段可行性研究( 第四篇- 地质) [R]. 成都: 中铁二院工程集团有限责任公司, 2010.
Yu Hongping,Zhang Chunxiang,Xu Xueyuan,etc.The Fourth Part of the Feasibility Study on the Section from Changsha to Kunming of the New Shanghai - Kunming Railway Passenger Special Line———Geology [R]. Chengdu: China Railway Eryuan Engineering Group Co. Ltd,2010.
[2] 郑天池,郑亚飞,乐重,等. 新建铁路沪昆客运专线长沙至昆明段可行性研究报告[R]. 成都: 中铁二院工程集团有限责任公司, 2010.
Zheng Tianchi,Zheng Yafei,Le Zhong,etc. Report of the Feasibility Study on the Section from Changsha to Kunming of the New Shanghai - Kunming Railway Passenger Special line[R]. Chengdu: China Railway Eryuan Engineering Group Co. Ltd,2010.
[3] 赵焕臣,许树柏. 层次分析法———一种简易的新决策方法[M]. 北京: 科学出版社, 1986.
Zhao Huanchen, Xu Shubo. Analytic Hierarchy Process———a New Easy Method of Policymaking[M].Beijing: Science Press,1986.
[4] 毛邦燕. 现代深部岩溶形成机理及其对越岭隧道工程控制作用评价[D]. 成都: 成都理工大学, 2008.
Mao Bangyan. Modern Deep Karst Formation Mechanism and Evaluation of Control Action on Cross -mountain Tunnel[D]. Chengdu: Chengdu University of Technology, 2008.
[5] 毛邦燕,许模,张世殊,等. 矿区水库渗漏影响评价问题模糊综合评价研究[J]. 人民长江,2007( 6) : 103 -106.
Mao Bangyan,Xu Mo,Zhang Shishu,etc. Fuzzy Comprehensive Evaluation of Key Problem In The Coal Mine Area Reservoir Seepage Influence Evaluation[J]. Yangtze River,2007( 6) : 103 - 106.
[6] 肖盛燮,王平义. 模糊数学在土木与水利工程中的应用[M]. 北京: 人民交通出版社, 2004.
Xiao Shengxie,Wang Pingyi. Application of Fuzzy Mathematics in Civil and Hydraulic Engineering[M]. Beijing: China Communications Press,2004.
[7] 王茂靖,张羽军,马建军. 黔桂线改扩建工程几处典型的地质选线[J]. 铁道工程学报, 2010( 7) : 24 - 29.
Wang Maojing,Zhang Yujun,Ma Jianjun. Typical Examples of Route Selection Based on Geological Conditions for Reconstruction of Guizhou - Guangxi Railway[J]. Journal of Railway Engineering Society,2010( 7) : 24 - 29.
[8] 何华武,曾强运. 复杂艰险山区地质勘察及选线技术[J]. 中国工程科学, 2009( 12) : 9 - 12.
He Huawu,Zen Qiangyun. Miscellaneous Dangerous Mountain Geological Survey and the Line Selection Techniques[J]. Engineering Science,2009( 12) : 9 -12.
[9] 吴光,肖道坦,蒋良文,等. 复杂山区高等级铁路选线工程地质的若干问[J]. 西南交通大学学报,2010( 4) : 527 - 532.
Wu Guang, Xiao Daotan, Jiang Liangwen, etc.Problems about Engineering Geology of High - Grade Railway Route Selection in Complicated Mountainous Areas[J]. Journal of Southwest Jiaotong University,2010( 4) : 527 - 532.
[10] 杜宇本,蒋良文. 大瑞铁路大保段主要工程地质问题及地质选线[J]. 铁道工程学报, 2010( 4) : 23 - 28.
Du Yuben, Jiang Liangwen. Main Problems in Engineering Geology and Alignment in Dali -Baoshan Section of Dali - Ruili Railway[J]. Journal of Railway Engineering Society,2010( 4) : 23 - 28.
[11] 朱颖,许佑顶,秦小林,等. 复杂艰险山区铁路选线与总体设计论文集[M]. 北京: 中国铁道出版社, 2010.
Zhu Ying,Xu Youding,Qin Xiaolin,etc. Papers of the Railway Route Selection and the Overall Design in Complex Dangerous Mountain Areas[M]. Beijing: China Railway Publishing House,2010.
|
|
|
|