Zhao Guotang. Improving Critical Velocity of Track Should Be Served As an Important Target for the Design of Passenger Special Line [J ].Chinese Railways,2005(1) : 40-42.
[4] R.F.Woldringh,B.M.New.Embankment design for high speed trains on soft soils conception de remblais sur sols meubles pour les chemins de fer à grande vitesse.Geotechnical Engineering for Transportation Infrastructure,Barends et al. (eds) 1999 Balkema, Rotterdam.
[5] Pekka Toivola,Anttoni Vesterinen.Real Time Safety and Structural Stability Monitoring of A Reconstructed Concrete Slab RailwayEmbankment on a Soft Ground after Its Collapse.Symposium " Keep Concrete Attractive",Budapest 2005: 1-6.
[6] Hans Bachmann,Winfried mohr,Fh martin Kowalski. The Rheda2000 Ballastless Track System [J]. European Railway Review,2003(1) 44-50.
[7] 王忠文,徐鹤寿.德国纽伦堡 -英格尔施塔特新建线的无砟轨道[J].中国铁路,2006(6) :21-24.
Wang Zhongwen,Xu Heshou. Ballastless Track of Newly - built Line from Nuremberg to Ingolstadt in Germany [J]. Chinese Railways,2006(6) :21-24.
[8] 詹永祥,蒋关鲁.武广线高边坡陡坡地段桩板结构路基的设计理论探讨[J].铁道工程学报,2007(S1) :94-96.
Zhan Yongxiang,Jiang Guanglu.Theoretical Exploration on Design of Pile - plate Structure Subgrade in Steep Slope Section of High Side Slope on Wuchang - Guangzhou Railway Passenger Dedicated Line [J]. Journal of Railway Engineering Society,2007(S1) : 94-96.
[9] 李绍文.遂渝铁路无砟轨道试验段路基综合施工技术[J].铁道建筑技术,2007(1) :6-9.
Li Shaowen.Comprehensive Construction Technology of Embankment in the Ballastless Track Test Section for Sui - Yu Railway [J].Railway Construction Technology,2007(1) : 6-9.
[10] 肖宏,郭丽娜.桩板结构技术应用研究[J].铁道标准设计,2010(2) :47-50.
Xiao Hong,Guo Lina.Study on the Application of Pile - slab StructureTechnology[J].Railway Standard Design,2010(2) :47-50.