In - situ Test and Analysis of Dynamic Responses of Red Clay Cutting Bedding of Wuhan - Guangzhou Passenger Dedicated Line |
WU Qiang |
China Railway Siyuan Survey and Design Group Co. Ltd,Wuhan,Hubei 430063,China |
|
|
Abstract Research purposes: The subgrade bed should have enough strength and stability to bear the train and track loads. With continuous increase of the train speed,the in - situ test and analysis of dynamic responses of red clay cutting bedding is very important to guide the design of the subgrade of high - speed railway.
Research conclusions: By in - situ test,the study was done on the dynamic responses characteristic of red clay cutting bedding of Wuhan - Guangzhou Passenger Dedicated Line at the locomotive speed of 300 ~ 350 km / h. The horizontal and vertical distribution regularity of the vibration velocity,vibration acceleration,dynamic strain and dynamic stress were analyzed under the condition that the train run in the different directions. The analysis showed all the response parameters of the vibration velocity,vibration acceleration,dynamic strain and dynamic stress were decreasing with the depth increasing. In the lateral test section,the change of response of the subgrade bedding was of the reversed V - shaped under effect of the train on right track and the response decreased with increase of the lateral distance under effect of train on the left track. Compared with the ballast track,the dynamic responses and decay rate of ballastless track were smaller,while the influence depth was larger. So it suggests the thickness of subgrade bedding of ballastless track should be 5 m. This study can provide an important reference to construction of other high - speed railway.
|
Received: 20 May 2011
|
|
|
|
|
[1] 陈雪华,律文田,王永和. 高速铁路路桥过渡段路基动响应特性研究[J]. 振动与冲击,2006( 3) : 95 -98.
Chen Xuehua,Lv Wentian,Wang Yonghe. Dynamic Responses Characteristic of Transition Section in High Speed Railway[J]. Journal of Vibration and Shock, 2006( 3) : 95 - 98.
[2] 李献民,王永和,杨果林,等. 高速下过渡段路基动响应特性研究[J]. 岩土工程学报,2004( 1) : 100 -104.
Li Xianmin,Wang Yonghe,Yang Guolin,etc. Study on the Dynamic Response of Transition Section Roadbed Subject to High Speed [J]. Chinese Journal of Geotechnical Engineering,2004( 1) : 100 - 104.
[3] Sunaga,Makoto. Vibration Behavior of Roadbed on Soft Groundstinder Trainload[J]. Quartly Report of RTRI,1990( 31) : 29 - 35.
[4] Leykauf,Gunther & Mamaer, Lothar. Elastisches Verformungs ver - Halten des Eisenbahnoberbaus[J]. Eisenbahnigenieur,1990( 3) : 111 - 119.
[5] 卢正,姚海林,骆行文,等. 公路交通荷载作用下分层地基的三维动响应分析[J]. 岩土力学,2009( 10) : 2965 - 2970.
Lu Zheng,Yao Hailin,Luo Xingwen,etc. 3D Dynamic Responses of Layered Ground under Vehicle Loads[J]. Rock and Soil M echanics,2009( 10) : 2965 - 2970.
[6] 曾跃华,王丽辉. 移动荷载作用下路面响应分析[J]. 湖南交通科技,2010( 2) : 4 -6.
Zeng Yuehua, Wang Lihui. Responses Analysis of Pavement Base under Traffic load[J]. Soil Engineering and Foundation,2010( 2) : 4 - 6.
[7] 杨仕若,曾庆元. 列车通过钢桁梁桥时动力响应分析[J]. 铁道工程学报,2010( 7) : 48 -51.
Yang Shiruo, Zeng Qingyuan. Analysis of Dynamic Response of Steel Truss Girder Bridge When Train Passing[J]. Journal of Railway Engineering Society, 2010( 7) : 48 - 51.
[8] 刘林芽,雷晓燕,练松良. 提速铁路过渡段的动力响应测试分析[J]. 铁道工程学报,2005( 5) : 15 -19.
Liu Linya,Lei Xiaoyan,Lian Songliang. Journal of Railway Engineering Society[J]. Journal of Railway Engineering Society,2005( 5) : 15 - 19.
[9] 李小和. 武广客运专线红黏土地基压缩模量确定方法研究[J]. 铁道工程学报,2008( 12) : 37 -40.
Li Xiaohe. Research on the Method of Obtaining Modulus of Compressibility of Red Clay Foundation of Wuchang - Guangzhou Passenger Dedicated Line[J]. Journal of Railway Engineering Society,2008( 12) : 37 - 40.
[10] 黄晓晖. 武广客运专线灰岩残积层红黏土力学特性现场试验研究[J]. 铁道勘察,2010( 2) : 19 -22.
Huang Xiaohui. Field Tests on Mechanical Properties of Red Clay at Limestone Eluvium along Wuhan - Guangzhou Passenger Dedicated Line [J]. Railway Investigation and Surveying,2010( 2) : 19 - 22.
[11] 中铁第四勘察设计院集团有限公司. 武广客运专线残积层红黏土基床动态稳定性研究分报告[R]. 武汉: 中铁第四勘察设计院集团有限公司,2009.
China Railway Siyuan Survey and Design Group Co. , Ltd. Dynamic Stability Analysis of of Limestone Residual Layer of Red Clay in Wuhan - Guangzhou Railway Passenger Dedicated Line[R]. Wuhan: China Railway Siyuan Survey and Design Group Co. ,Ltd, 2009.
|
|
|
|