铁道工程学报  2007, Vol. 24 Issue (5): 99-102    DOI:
Current Issue | Archive | Adv Search |
The Nonlinear Two-dimensional Finite Element Analysis for the Construction of Ciqikou Tunneling Subway Station with Center Drifts Excavation Method
CHENG Wen-bin
The Third Engineering Group Co. Ltd of China Railway, Shanxi,Taiyuan 030001,China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech