Abstract Research purposes: Temperature stress was regarded as one of the major reasons of cracking of concrete box girder. For providing design and engineering of box girder with beneficial references, the main purposes of temperature test of hydration are to grasp the regularities of distribution of hydration temperature follow box girder section and under considering the state of arts of concrete construction,we estimate temperature stress.
Research methods: The tests are carried out on mid-span and tip sections of box girder. With the principle of disclosing adequately the developmental rules of hydration of box girder, temperature probes covered in concrete are arranged at top tray, soleplate and web. Then the variation of hydration temperature would be measured after concrete placement.
Research results: With the results of temperature tests, time-temperature curves of hydration could be drawn. According to the test results of hydration temperature of Qinhuangdao-Shenyang Passenger Dedicated Railway Line concrete box girder, the general and developmental rules of concrete hydration temperature in earlier phase are discussed, including the commonly form of travel time curve, the basic rules of temperature rise and heat drop, the temperature gradient of concrete and the relations between pumping's temperature and thermal spike. Furthermore, the measures which are used to prevent concrete cracks caused by great temperature difference are given.
|
Received: 22 September 2005
|
|
|
|
|
[1] |
卢文良,季文玉,等.箱梁混凝土水化热温度及温度应变的试验研究[J].东北公路, 2002(4):62-65.
|
[3] |
雷加艳,季文玉,等.秦沈客运专线箱梁水化热温度、应变变化及裂缝控制[J].北方交通大学学报,2002(1):85-87,92.
|
[5] |
吴信然,杨启兵.秦沈客运专线箱梁和轨道工程施工新技术[M].北京:中国铁道出版社,2003.
|
[6] |
朱伯芳.大体积混凝土温度应力与温度控制[M].北京:中国电力出版社,1999.
|
[4] |
向敏,廖礼坤,等.混凝土箱形梁水化热温度场分析[J].石家庄铁道学院学报,2003(3):82-86.
|
[2] |
程俊瑞,季文玉,等.预应力混凝土箱梁水化热温度及应变的试验研究[J].公路交通科技, 2003(6):76-79.
|
|
|
|