铁道工程学报  2006, Vol. 23 Issue (6): 74-77    DOI:
Current Issue | Archive | Adv Search |
Application of Fuzzy Synthesis Evaluation in Reliability Allocation of the Catenary System
WAN Yi1, DING Dian-kuan2, DENG Bin1, LI Hui-jie3, KE Jian1
1.School of Mechanical Engineering, Southwest Jiaotong University, Chengdu 610031, China; 2. Department of electronic information Engineering, Anyang normal University, Anyang, Henan 455002, China; 3.The First Survey Design Institution of Railway, Lanzhou 730000, China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech