Research on Fuzzy Synthetic Evaluation of Railway Rail Joint Schemes |
GU Yong-lei1, WEI Qing-chao1, LI Li-jun2 |
1.Beijing Jiaotong University, Beijing 100044, China; 2.The Fifth Survey and Design Institute of China Railway, Beijing 102600, China |
|
|
Abstract Research purposes: In the new railway designing, choosing the rail joint scheme is one of the important problems at decision phase. Choosing the rail joint scheme is mainly to determine the choice of rail joint junction and orientation. Through researching the fuzzy synthetic evaluation, one quantitative method is put forward for demonstrating and choosing optimum scheme,for making the best railway designing.
Research methods: This paper analyzes all kinds of factors which influence choosing rail joint schemes. From the view of fuzziness on choosing optimum scheme from those to be demonstrated, fuzzy synthetic evaluation in theory are carried out for each factor by means of principle and way on Fuzzy Math.
Research results: Through the testing of the newly-built railway between Tiandong and Debao, the recommended scheme is put forward and the feasibility and practicability of the method is demonstrated.
Research conclusions: The fuzzy synthetic evaluation method is valuable for choosing the rail joint scheme, and can provide decision-making to designers. In practical application, the method could be optimized according to the different schemes.
|
Received: 08 May 2006
|
|
|
|
|
[2] |
郝诚铁道工程[M].北京:中国铁道出版社,2000.
|
[4] |
谢季,刘承平.模糊数学方法及其应用(第二版)[M].武汉:华中科技大学出版社,2000.
|
[1] |
刘红梅,白玉珍,阚叔愚.新建铁路线路基本走向和接轨点选择辅助决策系统的研究[J].北方交通大学学报, 1997,21(6):93-98.
|
[5] |
刘敏.工业编组站解体车列选定的模糊综合评判[J].铁道学报,2002,24(2):12-16.
|
[6] |
黄淑森.铁路路基基床状态的模糊综合评判[J].中国铁道科学,2005,26(3):56-59.
|
[7] |
铁道第五勘察设计院.新建铁路田东至德保线预可行性研究[R].北京:铁道第五勘察设计院,2005.
|
[3] |
崔丽红,魏庆朝.铁路线路选线设计及评价体系[C]//第十届全国结构工程学术会议论文集(第III卷).2001:413-416.
|
|
|
|