Numerical Simulation of Post-completion Settlement of Embankment Based on Creep Test |
YIN Hong-bo1, LIU Jun-xin2 |
1.The Third Survey and Design Institute of China Railway, Tianjin 300251, China; 2.Southwest Jiaotong University, Chengdu, Sichuan 610031, China |
|
|
Abstract Research purposes: High-speed railway requires zero settlement for the post-completion settlement of embankment in order to maintain the regularity and stability of track. Red rock belongs to the filling of C type and is easy to disintegrate and soften. The purposes of the research are to test and verify the feasibility of red rock as filling for embankment of high-speed railway after smashing.
Research methods: First smash the filling of red rock to less than 2 mm and increase the compactness of sample to 95%, then make step-by-step single axle loading on the sample until the sample damages. The duration of loading for one step is about one month. At the same time, fit the reduced section of creep curve with K-K-H model based on the test result of creep curve by step-by-step loading, and predict the post-completion settlement of the embankment with 10 m high filling by adopting numerical simulation according to the fitting result.
Research results: It is known from the result of numerical simulation; the post-completion settlement of embankment top as 4 mm for one year and embankment top is in stable status about 40 days.
Research Conclusions: The result shows red rock as filling can meet the requirement of post-completion zero settlement for embankment after it is treated by construction technique.
|
Received: 05 June 2006
|
|
|
|
|
[1] |
杨广庆,,李树山,刘田明.高速铁路路基设计与施工[M].北京:中国铁道出版社.1999.
|
[3] |
李廷勇,王建力.中国的红层及发育的地貌类型[J].四川师范大学学报(自然科学版),2002(25):427-431.
|
[5] |
赵明华,刘晓明,苏永华.含崩解软岩红层材料路用工程特性试验研究[J].岩土工程学报,2005,26(6):667-671.
|
[2] |
冯启言,韩宝平,隋旺华.鲁西南地区红层软岩水岩作用特征与工程应用[J].工程地质学报.1999,7(3):266-267.
|
[4] |
赵明华,邓觐宇,曹文贵.红砂岩崩解特性及其路堤填筑技术研究[J].中国公路学报,2003,16(3):1-5.
|
|
|
|