SUSPENDED BASKET DESIGN OF WIDER BRIDGE AND TECHNIQUE OF CANTILEVER CONSTRUCTION |
LIN Yu-sen1, ZHANG Yun-bo2, QIANG Shi-zhong1 |
1School of Civil Engineer Southwest Jiao tong University; 2School of Civil Engineering Shi Jia zhuang Railway Institute |
|
|
Abstract Research purposes: Suspended basket construction is a main method in cantilever construction. Bridge construction quality is concerned with suspended basket, which is the supporting structure in construction.
Research methods: By a prestressed concrete low-tower cable-stayed bridge, which is single-chest and three-chamber structure, whose most width is 27. 5 m and whose longest beam is 4 m, this paper introduces a design of suspended basket, and a technique of construction, and puts emphases on the suspended basket structure, installation and moving process. The problems which may be paid attention to in cantilever construction are expatiated.
Research conclusions: This practice of Engineering proved this suspended basket design was reasonable and could satisfy the requirement of engineering. This was instructive to the same style bridges.
|
Received: 14 October 2005
|
|
|
|
|
[3] |
王武勤.PC桥梁悬臂灌注施工挂蓝的发展[J].桥梁建设,1997(4):55-57.
|
[5] |
GBJ17-88.钢结构设计手册[S].北京:人民交通出版社,1988.
|
[2] |
刘刚亮,王中文.轻型鹰式挂蓝的总体设计[J].桥梁建设,1998(4):62-64.
|
[4] |
韩叙领,等.公路装配式钢梁桥桁架挂蓝施工技术的改进[J].华北水利水电学院学报,2002(2):39-42.
|
[1] |
雷波等.轻型挂蓝构思与主桁设计[J].公路,1995(1):4-9.
|
|
|
|