NUMERICAL MODELING ANALYSIS OF THE CONSTRUCTION METHOD WITH SEVERAL LAYERS EXCAVATING AND STRESS DISCHARGING IN ADVANCE FOR LARGE UNDERGROUND CAVITY

BI Ji-hong, DU Yu-dong

Journal of Railway Engineering Society ›› 2006, Vol. 23 ›› Issue (1) : 82-86.

PDF(557 KB)
PDF(557 KB)
Journal of Railway Engineering Society ›› 2006, Vol. 23 ›› Issue (1) : 82-86.

NUMERICAL MODELING ANALYSIS OF THE CONSTRUCTION METHOD WITH SEVERAL LAYERS EXCAVATING AND STRESS DISCHARGING IN ADVANCE FOR LARGE UNDERGROUND CAVITY

  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2006, 23(1): 82-86

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(557 KB)

Accesses

Citation

Detail

Sections
Recommended

/