Abstract Research purposes: In order to resolve the difficulties in using”Interim Rules of Risk Evaluating and Management on Railway Tunnels" and”Guideline of Risk Management for Construction of Subway and Underground Works",this paper finds out a risk analysis method with simple used and maneuverability.
Research conclusions :(1)The result indicates that the risks of working drawing design, piling cut and pre-jack are greater than the ones of construction conditions and others.(2)The method of De1Phi uniting AHP could get the half-quantity result, which could meet the requests of”Interim Rules of Risk Evaluating and Management on Railway Tunnels" and "Guideline of Risk Management for Construction of Subway and Underground Works".( 3 ) 1'he method of De1Phi uniting AHP holds true for risk evaluating of simple works and risk identity of complex projects.
|
Received: 20 June 2008
|
|
|
|
|
[1]刘希林,莫多闻.泥石流风险及沟谷泥石流风险度评价 [J].工程地质学报,2002,10(3):266-273.
[2]苏燕.隧道抗震风险评估初探[J].福州大学学报(自然 科学版),2004,32(1) :65-68.
[3]魏一鸣,等.洪水灾害风险管理理论[M].北京:科学出 版社,2002.
[4]邓丽娜.层次分析法在隧道工程风险评估中的应用[J]. 四川建筑,2005,25(1) :142-143.
[5]李俊伟,黄宏伟,熵度量法在地下工程风险分析中的应 用初探[J].地下空间与工程学报,2005 ,1 (6 ) : 925 - 928.
[6]马辉民,等.应用AHP层次分析法评估ERP项目风险 [J].计算机与数字工程,2006,34(3):41-44.
|
|
|
|