|
|
The Influence of Land Subsidence on the Bridge of High-speed Railway and Its Engineering Countermeasures |
LI Guo-he1,SUN Shu-li1,XU Zai-liang1,ZHANG Jian-min2 |
1. The Third Railway Survey and Design Institute Group Corporation, Tianjin 300142, China;2. Tsinghua University,Beijing 100084,China |
|
|
Abstract Research purposes: The study is done on the influences of land subsidences on the bridges of high-speed railway at different stages in different areas and the preventive and engineering rmeasures for subsidence are presented for the purpose of providing reference to survey, design and construction of high-speed railway.
Research conclusions: In the central area of land subsidence and vicinity of the pumping well, the uneven subsidence is more serious , which much influences the bridge structure. In the extended area of land subsidence , the deformations of strata and bridge caused by land subsidence are ,longitudinal ones with large subsidence volume, but which has little influence on the bridge structure. In the area of land subsidence, the subsidence happens slowly, which has a little influence on the construction of bridge, but the large subsidence may happen in some places, so it is necessary to select bridge site rationally, optimize the layout and structure type of bridge, adopt simply-supported structure and take the engineering measures to enhance the bridge capacity against the subsidence.
|
Received: 15 January 2008
|
|
|
|
|
[1] 缪俊发,吴林高,王璋群.大型深井点降水引起地面沉降 的研究[J].岩土工程学报,1991,13(3): 60-64.
[2] 冉启全,顾小芸.考虑流变特性的流固祸合地面沉降计 算模型[J].中国地质灾害与防治学报,1998,9(2) : 88 - 93.
[3] 王光亚.抽水地面沉降模型研究的回顾与展望[J].工程 地质学报,2005(13) : 37-42.
[4] 李国和,许再良,孙树礼,等.华北平原地面沉降对高速铁 路的影响及对策[J].铁道工程学报,2007(8) : 7-12.
[5]铁建设[2007]47号,新建时速300~350公里客运专线 铁路设计暂行规定(上、下)[S].
[6] 赵建峰,周正礼,李国和,等.区域地面沉降和地裂缝对拟 建某高速铁路(北京至济南段)的影响及对策研究[R]. 天津:铁道第三勘察设计院,2006.
|
|
|
|