Safety Analysis and Protection Scheme Research of Wenzhou South Block Post
|
CHEN Yu-ping,LI Qian-she |
China Railway Siyuan Survey and Design Group Co. Ltd, Wuhan, Hubei 430063, China |
|
|
Abstract Abstract:Research purposes: In order to solve the problem which Wenzhou South block post does not meet the conditions of setting catch siding, we find some risk conditions by the safety analysis of a train runing between the block post and Wenzhou South Station. We put forward some protection schemes by researching the relevant specifications, block post layout and signal control system.
Research conclusions:(1)Recognizes 8 kinds potentially risk conditions from 20 kinds of conditions, in which the SZ-front straight back side and SZ-front side back straight need to focus on prevention. (2) The on-board equipment can ensure traffic safety in a variety of operating conditions, when the equipments are normal. (3) When the trains running in reverse direction and the automatic block bewteen Wenzhou South Station and Qingtian Station is setted, all the conditions are safe. (4) The security solution is that optimizing traffic organization, moving the block signal of the block post farther or the latter signal displaying red repeatedly. (5)This method can be a reference to a similar traffic safety analysis.
|
|
|
|
|
[1]中铁第四勘察设计院集团有限公司.杭长杭州南线路所信号系统工程设计安全风险评估报告[R] . 中铁第四勘察设计院集团有限公司,2014.
China Railway Siyuan Survey and Design Group Co. Ltd. The Safety Assessment Report on Signal Systems Engineering Design of Hangchang Hangzhou South Block Post[R] . China Railway Siyuan Survey and Design Group Co.Ltd,2014.
[2]傅世善. 高速铁路与铁路信号第六讲关于安全距离与过走距离的考虑[J]. 铁路通信信号工程技术,2012(2):86-88.
Fu Shishan.The Sixth Lecture of High Speed Railway and the Railway Signal on the Consideration of Safe Distance and Passing Distance[J]. Railway Signal & Communication Engineering and Technology, 2012(2):86-88.
[3]TG/01—2014,铁路技术管理规程(普速铁路部分)[S].
TG/01—2014, Regulations of Railway Technical Operation(Ordinary Speed Railway Section)[S].
[4]铁总运[2014]29号, CTCS-2级列控车载设备暂行技术规范 [S].
China Railway Corporation Transport[2014]No.29, Interim Technical Specifications on CTCS-2 on-board Equipment [S].
[5]科技运[2010]136号, CTCS-2级列控系统应答器应用原则(V2.0)[S].
Science and Technology Transport[2010] No.136,The Balise Application Principles of CTCS-2 Train Control System(V2.0)[S] .
[6]石先明,张敏慧. 高速铁路列控系统安全性分析与改进[J] 铁道标准设计,2012(11):101-106.
Shi Xianming, Zhang Minhui. The Security Analysis and Improvement of the Train Control System for High-speed Railway[J]. Railway Standard Design, 2012(11):101-106.
[7]TG/01—2014,铁路技术管理规程(高速铁路部分)[S].
TG/01—2014,Regulations of Railway Technical Operation(High Speed Railway Section)[S].
[8]铁运[2007]48号,列车运行监控记录装置控制模式设定规则[S].
Railway Transport[2007]No.48,The Control Mode Setting Rule of Train Monitoring and Recording Device[S]. |
|
|
|