[2]姜军,宋保维,潘光,王鹏.基于集对分析的模糊综合判断[J]. 西北工业大学学报,2007(6):421-424.
Jiang Jun, Song Baowei, Pan Guang, Wang Peng. A Novel Method For Fuzzy Comprehensive Evaluation Based On Set Pair Analysis [J]. Journal Of Northwestern Polytechnical University, 2007(6):421-424.
[3] 张文.武汉至咸宁城际铁路引入武汉枢纽方案研究[J].铁道勘察,2010(3):79—82.
Zhang Wen.Scheme on How Wuhan—Xianning Intercity Railway Leading into Wuhan Hub[J].Railway Investigation,2010(1):79一配.
[4] 李冰.客运专线引入铁路枢纽的方案评价[J].铁道运输与经济,2007(3):88—91.
Li Bing.Scheme Choice for Introducing Passenger Dedicated Line into Railway Terminal[J].Railway Transport and Economy,2007(3):88-91.
[5] 夏维毅,李海鹰.哈大客运专线引入哈尔滨枢纽方案研究[J].铁道运输与经济,2004(5):58—61.
Xia Weiyi,Li Haiying.Study on the Plan of Introducing Ha--Da Passenger Dedicated Line into Haerbin Joint Terminal[J].Railway Transport and Economy,2004(5):58-61.
[6] 张晓晴.高速铁路引入铁路枢纽径路设计[J].铁道勘察,2004(6):41—44.
Zhang Xiaoqing.Permanent Way Design of Express Railway Leading to the Railway Terminal[J].Railway Investigation,2004(6):41—44.
[7] 凌汉东,蒋惠园.基于集对分析的Lagos地区轨道交通线路方案研究[J].铁道工程学报,2009(4):82—85.
Ling Handong,Jiang Huiyuan.Research on the Track Program of Rail Transit in Lagos with Set Pair Analysis the ory[J].Journal of Railway Engineering Society,2009(4):82-85.
[8]潘玲巧,焦永兰,林志安.基于集对分析的客运专线引入铁路枢纽客运站选址方案比选[J].中国铁道科学,2009(5):125—129.
Pan Lingqiao,Jiao Yonglan,Lin Zhian.Comparison of the Plan Selection in Passenger Station Location of Introducing Passenger Dedicated Line into Hub Based on Set Pair Analysis[J].China Railway Science,2009 (5):125—129.
[9] Zhai Liang,Tang Xinming.Fuzzy Comprehensive Evalnation Method and Its Application in Subjective QuaUty Assessment for Compressed Remote Sensing Images[J].Fuzzy Systems and Knowledge Discovery,2007(8):145—148.
[10]Jie Yao,Wang Lichun,Liu BinBin.Application of Fuzzy Comprehensive Evaluation Method for Bid Evaluation of Power Equipment Based on Wight of entropy[J].Information Management,Innovation Management and Industrial Engineering,加眇(12):456—458.