|
|
Analysis of Problems Related to Reinforcement of Soft Foundation of Embankment with Vacuum Combined Surcharge Preloading |
CHEN Hua—ming,LI Shi—liang |
China Railway Siyuan Survey and Design Group Co. Ltd. , Wuhan, Hubei 430063, China |
|
|
Abstract Research purposes: The vacuum combined surcharge preloading technology has been widely applied in construction of port and road.However,its reinforcement mechanism and settlement calculation methods are still in controversy or unclear to affect its development and application.Combining the engineering test data,this paper analyzes the characteristics of vacuum combined surcharge preloading technology,including the№nsferring law of vacuum degree,change and dissipation characteristics of pore water pressure,foundation settlement rule and control effect of post—construction settlement and SO on.and discusses the relative problems in design and construction with vacuum combined surcharge preloading,such as the calculation methods for the foundation settlement and the influence factors on the post—construction settlement.
Research conclusions:fter eliminating the effect of vacuum degree,the increases and dissipation characteristics of excess pore water pressure under vacuum combined surcharge preloading foundation is basically consistent with that of single surcharge preloading,and there is no essential difference in reinforcement mechanism of them.Additional stress and reinforcement depth of vacuum preloading foundation is obviously different with that of single surcharge preloading,SO it should be considered in settlement calculation.At last,the control of the post—construction settlement under vacuum combined surcharge preloading is closely related to foundation conditions and embankment height and 80 on,80 its application must be considered in design and construction according to technical standard.
|
Received: 30 September 2010
|
|
|
|
|
[1] JTJ 250一8,港口工程地基规范[s].
JTJ 250—98.Groundsill Code for Port Engineering [S].
[2] 叶柏荣.真空预压加固法的发展及工程实录[J].地基 处理,1995(3):1—10.
Ye Bairong.Development and Engineering Memoir for Vacuum Preloading[J].Ground Improvement,1995 (3):1—10.
[3] 崔俊杰韩志霞宋绪国.天津港集装箱物流中心堆场地 基加固设计[J].铁道工程学报,2007(10):25—27.
Cni Junjie,Han Zhixia,song Xuguo.Design for Foundation Strengthening for Tianjin Harbor Logistic Center Container Yard[J].Journal of Railway Engineering Society,2007(10):25—27.
[4]陈环.真空预压法机理研究十年[J].港口工程,1991 (4):17—26.
Chen Huan.TEN Years Research for Mechanism of Vacuum Preloading[J].Port Engineering,1991(4):17— 26.
[5]娄炎.真空排水预压法加固软土技术[M].北京:人民交 通出版社,2002.
Luo Yan.Technology of Treating Soft Foundation with Vacumn Prdoaceng[M].Beijing:China Commadcations Press 2002
[6] 龚晓南,岑仰润.真空预压加固软土地基机理探讨[J], 哈尔滨建筑大学学报,2002(2):7—10.
Gong Xiaonan,Cen Yangrun.Mechanism of Vacuum Preloading[J].Journal of Harbin University of C.E.& Architecture,2002(2):7一10.
[7]李就好.真空一堆载联合预压法在软基加固中的应用 [J].岩土力学,1999(4):58—62.
Li Jiuhao.The Application of Vacuum—Heapled Load Combining Precompression in the Consolidation of Soft Clay[J].Rock and Soil Mechanics,1999(4):58—62.
[8] 李时亮,李小和,等.武汉新区梅子路真空一堆载联合预 压处理软土地基试验研究报告[R].武汉:铁道第四勘察 设计院,2005:3—8.
Li Shiliang,Li Xiaohe,etc.The Research Report for Reinforcement of Soft Foundation of Embankment with Vacuum Combined Surcharge Preloading in Wuhan [R].Wuhan:China Railway Siyuan Survey and Resign Group Co.Ltd,2005.
|
|
|
|