[1] 严国敏.现代斜拉桥[M ].成都:西南交通大学出版社, 1995: 63 -67.
Yan Guomin. Modern Cable -stayed Bridge [M ]. Chengdu: Southwest Jiaotong University Press, 1995: 63 - 67.
[2] 王嘉弟,赵廷衡.斜拉桥钢箱梁索梁锚固区域应力应变 分析[J].桥梁建设, 1997(4): 20 -25.
Wang Jiadi, Zhao Tingheng. Analysis of Stress-strain at Anchorage between Box -Shaped Steel Beams and Cables in Cable - stayed Bridge [ J ]. Bridge Construction, 1997(4): 20 -25.
[3] 李小珍,蔡靖,强士中.大跨度钢箱梁斜拉桥索梁锚固结 构形式的比较研究[J].土木工程学报, 2004(3): 73 - 79.
Li Xiaozhen, Cai Jing, Qiang Shizhong. Studies on Models of Cable -girder Anchorage for Long Span Cable -stayed Bridges with Steel Box Girder [ J ]. China Civil Engineering Journal, 2004(3): 73 -79.
[4] 满洪高,李乔,唐亮.钢斜拉桥锚箱式索梁锚固区合理构 造型式研究[J].中国铁道科学, 2005(4): 23 -27.
Man Honggao, Li Qiao, Tang Liang. Preliminary Study on the Reasonable Pattern of Cable-girder Anchorage for Steel Cable - stayed Bridges. China Railway Science, 2005(4): 23 -27.
[5] 朱劲松,肖汝城,曹一山.杭州湾跨海大桥索梁锚固节点 模型试验研究[J].土木工程学报, 2006(10): 68 -73.
Zhu Jinsong, Xiao Rucheng, Cao Yishan. Model Test on the Cable Anchorage of the Main Girder of the Hangzhou Bay Bridge [J ]. China Civil Engineering Journal, 2006(10): 68 -73.
[6] 万臻,李乔.大跨度斜拉桥拉索锚固区三维有限元仿真 分析[J].中国铁道科学, 2006(2): 41 -45.
Wan Zhen, Li Qiao. 3D Finite Element Analysis of Cable - G irder Anchorage Zone for Long Span Cable -stayed bridge[J]. China Railway Science, 2006(2): 41 -45.
[7] 刘庆宽,王新敏,强士中.南京长江二桥南汉桥索梁锚固 足尺模型试验研究[J].土木工程学报, 2001(2): 50 - 54.
L iu Qingkuan, Wang Xinmin, Qiang Shizhong. Full Scale Model Test on Anchorage Zone of the Second Yangtze River Bridge at Nanjing [ J ]. China Civil Engineering Journal, 2001(2): 50 -54.
[8] 周绪红,吕忠达,狄谨,等.钢箱梁斜拉桥索梁锚固区极 限承载力分析[J].长安大学学报, 2007(3): 47 -51.
Zhou Xuhong, Lu Zhongda, Di Jin, etc. Analysis of Ultimate Bearing Capacity on Cable -girder Anchorage Zone of Cable -stayed Bridge with Steel Box Girder [J]. Journal of Chang.an University, 2007(3): 47 - 51.
[9] 涂杨志.斜拉-拱组合桥索梁及索塔锚固区局部应力分 析[J].铁道工程学报, 2009(2): 64 -68.
Tu Yangzhi. Analysis of the Local Stress in Cable - beam and Cable -tower Anchorage Zone of Cable - stayed Arch Combined Bridge [J]. Journal of Railway Engineering Society, 2009(2): 64 -68.
|