Checking Calculation ofAuto-passing Phase Splitting by CTCS-3 -based EMU |
GENG Jing-chun |
The Third Railway Survey and Design InstituteGroup Corporation, Tianjin 300251, China |
|
|
Abstract Research purposes: The position of the electric phase splitting is one of the key factors forensuring safe and reliable operation of train on passenger dedicated line. This papermainly researches the influence of the signal system and train control system on locating the electric phase splitting, and presents the calculation principles and analysis model for checking calculation ofauto-passing phase splitting by the CTCS -3 -based EMU for providing the reference to survey and design of passenger dedicated line.
Research conclusions: According to the calculation principles, for the track where only the single -unit EMU composed of 8 coaches runs, it is suggested that the minimum distance between signal and electric phase splitting should be not less than 217. 5meters. For the track where the twin -unit EMU composed of 16 coaches runs with speed of 200 km /h, the minimum distance between signal and electric phase splitting should be not less than 431. 05 meters, and when the distance is notup to 431. 05 meters, the average start gradient should be no more than 15. 5‰.
|
Received: 14 May 2010
|
|
|
|
|
[1] TB 10621-2009,高速铁路设计规范(试行) [S].
TB 10621-2009, Code for Design of High Speed Railway[S].
[2] 中华人民共和国铁道部.关于印发5时速200和300公 里动车组主要技术条件6的通知[S].
Ministry of Railways of the Peoples.Republic of China. A Notification in Respect of the Main Technical Parameters of Electric Multiple Unit of 200 km /h and 300 km /h[S].
[3] 铁道部科学技术司,铁道部运输局.关于印发5CTCS -3 级列控系统应答器应用原则(V1. 0)6及专家评审意见 的通知[S].
Science and Technology Department of the Ministry of Railways, Transport Department of the Ministry of Railways. A Notification in Respect of the Applied Principle of Balisa Based on CTCS -3 and Expert Advice[S].
[4] 张中央.列车牵引计算[M ].中国铁道出版社, 2006.
Zhang Zhongyang. Computation of Train Traction [M ]. Beijing:China Railway Publishing House, 2006.
[5] 毛保华.列车运行计算和设计[M ].北京:人民交通出版 社, 2008.
Mao Baohua. Computation and Design of Train Traction [M ]. BeiJing: China Communications Press, 2008.
[6] 唐伟强,张继清.天津地下直径线最大坡度研究[J].铁 道工程学报, 2008(2): 89 -93.
Tang Weiqiang, Zhang Jiqing. Research on the Maximum Grade of Tianjin Underground Zhijing Line [J]. Journal of Railway Engineering Society, 2008(2): 89 -93.
[7] 苏梅.客货共线铁路隧道内最大坡度设计浅析[J].铁道 工程学报. 2009(8): 73 -76.
Su Me.i Analysis of Design of the Maximum Track Gradient in Tunnel for Mixed Passenger and Freight Railway[J]. Journal of Railway Engineering Society, 2009(8): 73 -76.
[8] 陈亮.贵阳至广州线线路最大坡度方案比选[J].铁道工 程学报, 2008(8): 18 -22.
Chen Liang. Scheme Alternative of Maximum Route Gradient on Guiyang - Guangzhou Railway [ J ]. Journal ofRailway Engineering Society, 2008(8): 18 - 22.
[9] 季学胜,李开成,杨悌惠. CTCS -3级列控系统的系统评 估研究[J].铁道通信信号, 2009(6): 1 -5.
Ji Xuesheng, Li Kaicheng, Yang Tihui. System Assessment of CTCS Level 3 Train Control System [J]. Railway Signalling & Communication, 2009(6): 1 -5.
[10]刘波,韩彦辉. FLAC原理、实例与应用指南[M ].北京: 人民交通出版社, 2005.
Liu Bo,Han Yanhui. Principles, Case and Using Guide of FLAC3D [M ]. Beijing: China Communications Press, 2005.
[11 ]Lee T K G. Three-dim ensional numerical studies of NATM tunneling in stiff clay [D ]. Hong Kong: Hong Kong University, 2003.
[12]Itasca Consulting Group Inc. FLAC3D ( Fast Lagrangian Analysis of Continua in three - dimensional) User Manuals ( Version 3. 0 ) [R ]. Minneapolis, Minnesota: Itasca Consulting Group Inc, 2005.
[13]徐干成,等.地下工程支护结构[M ].北京:中国水利水电 出版社, 2002.
Xu Gancheng, etc. Anchor Supporting System of Underground Engineering [M ]. Beijing: Chinese Water Power Press, 2002.
[14]李亚武.岩溶地基处理技术[J].铁道工程学报, 2002 (4): 44 -49.
Liyawu. Technique on Treatment of Karst Foundation [J]. Journal of Railway Engineering Society, 2002(4): 44 -49.
[15]铁建设函[2005 ]754号,客运专线无碴轨道铁路设计指 南[S].
TJSH [2005] No. 754, Design Guide for PDL Ballastless Track Engineering[S].
|
|
|
|