Abstract Research purposes:The leaping development of railway brings about the big change of railway construction concept. How the design of railway station yard suits such new construction requirements becomes an important issue. Based on the many years' design consultation, working out the specifications and codes, and technical management experience, this paper summarizes the concepts and characteristics of planning and construction of railway station yard and terminal under the new situation from a macroscopic point of view, for providing the reference to similar design.
Research conclusions:The operation convenience and engineering savings are of a contrariety in certain sense. The design concept of railway station yard should take the maximums of the operating conditions and traffic capacity as the first element for adjustment and integration of productivity. The allocation of passenger and freight traffic equipments shall take serving the local development as the goal. In the designs of terminal and regional station yard, the design concepts of "separating passenger and freight traffic into different stations or tracks" and "passenger train running on inside line and freight train running on outside line" should be followed. In any instance, the more attention should be paid to the safety of operations. In the specific engineering design, the design should be optimized according to the local circumstances to achieve the optimal project and operating effect.
|
Received: 30 January 2010
|
|
|
|
|
[ 1 ] 铁道部令第29号. 铁路技术管理规程[S].
MOR Ling No.29, Specification for Railway Technical Management[S].
[ 2 ] GB 50091—2006. 铁路车站及枢纽设计规范[S].
GB50091—2006. Code for Design of Railway Station and Terminal[S].
[ 3 ] 铁建设〔2007〕47号. 时速300~350公里客运专线铁路设计暂行规定[S].
Railway Construction[2007] No.47, Code for Design of High-speed Railway [S].
[ 4 ] 中铁二院工程集团有限责任公司. 重钢环保搬迁工程初步设计[Z]. 成都: 中铁二院工程集团有限责任公司. 2008.
CREEC, Initial Design of Chongqing Steel Plant Environmental Relocation Project[Z]. Chengdu: China Railway Eryuan Engineering Group Co. Ltd, 2008.
[ 5 ] 中铁二院工程集团有限责任公司. 西成客运专线初步设计[Z]. 成都: 中铁二院工程集团有限责任公司. 2009.
CREEC, Initial Design of Xi-Cheng Passenger Dedicated Railway[Z]. Chengdu: China Railway Eryuan Engineering Group Co. Ltd, 2009.
[ 6 ] 中铁二院工程集团有限责任公司. 成都枢纽货车外绕线工程初步设计[Z].成都: 中铁二院工程集团有限责任公司. 2008.
CREEC, Initial Design of Freight Train Rerouting Project outside of Chengdu Terminal[Z]. Chengdu: China Railway Eryuan Engineering Group Co. Ltd, 2008.
[ 7 ] 中铁二院工程集团有限责任公司. 兰渝线初步设计[Z]. 成都: 中铁二院工程集团有限责任公司, 2008.
CREEC, Initial Design of Lan-Yu Railway[Z]. Chengdu: China Railway Eryuan Engineering Group Co. Ltd, 2008.
[ 8 ] 中铁二院工程集团有限责任公司. 长昆客运专线初步设计[Z]. 成都: 中铁二院工程集团有限责任公司.
CREEC. Initial Design of Chang-Kun Passenger Dedicated Railway[Z]. Chengdu: China Railway Eryuan Engineering Group Co. Ltd, 2009.
|
|
|
|