Research on the Space Stress-distribution Characteristics of Long-span and Complex Structure Bridge during the Whole Construction Process |
HU Guo-wei1, ZHANG Yu-ning1, ZHANG Jun-bing1, SHI Zhou2 |
1.The Third Engineering Group Co. Ltd. Of China Railway, Taiyuan, Shanxi 030001, China;2. Southwest Jiaotong University, Sichuan, Chengdu 610031, China |
|
|
Abstract Research purposes:By establishing three-dimensional non-linear model with aging and road construction efficiency analysis for the whole construction process, the research is done on the space stress-distribution characteristics of large-span V-shaped continuous rigid frame arch composite structure bridge during the whole construction process to solve the problem of uneven stress-distribution on the cross-section due to the shear lag and distortion of concrete box girder with the previous calculation method for bridge design and construction monitoring.
Research conclusions:The analyses are made for the space stress-distribution and spatial variation of the longitudinal normal stress and transverse compressive stresson the roof and the shear stresson the sternum of large-span V-shaped continuous rigid frame arch composite structure bridge and their change regulations during the whole construction process. From the analyses the following conclusions are drawn: Firstly, the longitudinal normal stress on the roof of main girder is distributed along the transverse direction with unevenness, and the shear lag effects of the stress are obvious, which is different from the predicted results with elementary beam theory. Secondly, the transverse compressive stress of the main girder is not big and the uneven level of stress distribution on the roof is more than that on the floor.Thirdly, the shear stress distribution on the tri-web of single-box and double-booth section girder continuously changes and the shear stress on center web is slightly greater than that on the side web with good regulation. Lastly, during construction the envelope of longitudinal normal stress reflects the working condition with the maximum tensile stress and maximum compressive stress and this provides a theoretical basis for construction control.
|
Received: 21 November 2009
|
|
|
|
|
[ 1 ] 赖国政,吕容涛.基于梁格法及板壳有限元法的立交桥空问分析[J]. 武汉工程大学学报, 2008(1): 37 -40.
Lai Guozhen, LV Rongtou. The Overpasses Spatial Analysis Based on Grillage Method and Shell Element of Finite Element Method[J]. Wuhan University Journal, 2008(1): 37 -40.
[ 2 ] 刘小燕,张欣,李斌.基于能量变分原理的槽型宽翼受压构件剪滞效应和影响参数[J]. 长沙理工大学学报(自然科学版), 2009(1): 10 -14.
Liu Xiaoyan, Zhang xin, LI Bin. Shear Lag Effect of Wide-flange Beam under Axial Loading Based on Energy-variation Principle and Parameter Analysis[J]. Journal of Changsha University of Science and Technology (Natural Science), 2009(1): 10 -14.
[ 3 ] 曹志远.土木工程分析的施工力学与时变力学基础[J]. 土木工程学报, 2001(3): 41 -46.
Cao Zhiyuan. Constuction Mechanics and Time-varying Mechanics in Civil Engineering[J]. China Civil Engineering Journal, 2001(3): 41 -46.
[ 4 ] 孙庆新,陈旭勇,杨冬波.刚构连续弯板桥空问有限元分析[J]. 武汉工程大学学报, 2009(5): 41 -47.
Sun Qingxin, Chen Xuyong, Yang Dongbo. Control Technique of Linear form in High Bridge Piers Construction[J]. Wuhan University Journal, 2009(5): 41-47.
[ 5 ] 陈丹华,陈水生,程海根.预应力混凝土箱梁桥腹板主应力影响因素研究[J].铁道工程学报, 2006(6): 34 -38.
Chen Danhua, Chen Shuisheng, Cheng Haigen. Research on the Influence Factor of Web's Principle Stress for Box Girder Bridges[J]. Journal of Railway Engineering Society, 2006(6): 34 -38.
[ 6 ] 薛伟辰,王巍.轨道交通预应力混凝土梁施工阶段徐变性能研究[J]. 铁道学报, 2008(1): 53 -59.
Xue Weichen, Wang Wei. Study on Creep Behavior of Prestressed Concrete Beams for Rail Transportation during Construction Stage[J]. Journal of the China Railway Society, 2008(1): 53 -59.
[ 7 ] 林丽霞,吴亚平,丁南宏,等.考虑剪滞效应下计算钢筋混凝土箱梁应力的换算截面法[J]. 兰州理工大学学报,2009(2): 122 -126.
Lin Lixia, Wu Yaping, Ding Nanhong, etc. Transformation -section Method for Stress Calculation of Reinforced Concrete Box Beams with Shear Lag[J]. Journal of Lanzhou University of Technology, 2009(2): 122 -126.
|
|
|
|