Discussion on the Measures for Guaranteeing Effective Prestress of Vertical Prestressed Reinforcement of Box Girder Bridge |
XU Hua-xuan |
China Railway 16th Group Co. Ltd., Beijing 100018, China |
|
|
Abstract Research purposes:Based on the theoretic analysis, test and practice, the research is done on the reasons for the big pretress loss and poor effect of prestressed reinforcement of the web plate of concrete box girder, and the measures for them are presented to guarantee the effect of the vertical prestress and avoid the appearance of stress crack on the web plate.
Research conclusions:In design, the ratio between the stress and yield degree of vertical reinforcement should be controlled. The rebound value of 1.65 mm should be adopted when calculating the stress loss caused by anchor deformation and gap compression. The stress loss caused by installation error of anchor backer should be added and the rebound of 3.3 mm should be used. The stress loss caused by water thermalization of concrete and cement grout should be considered and the attention should be paid to improvement of the construction technique in construction. The error of incline angle should be controlled to make two flat and one straight and make the included angle within 1o when installing the anchor backer. The anchor torque of 1 200 N·m and 600 N·m with torque spanner should be used to φ32 reinforcement and φ25 reinforcement. The tension and super tension techniques should be used. The four groups of vertical reinforcements on the joint place of the front part and the rear part of the girder and the reinforcements on the rear part of the girder should be tensed at the same time.
|
Received: 29 August 2009
|
|
|
|
|
[ 1 ] 刘学伟.竖向预应力钢筋锚垫板安装倾角对预应力损失的影响[D].长沙:湖南科技大学, 2008.
Liu Xuewei. Influnce of Vertical Prestressed Steel Anchor Backing Plate Installated Dip on Prestressed Loss[D]. Changsha: Hunan University of Science and Technology, 2008.
[ 2 ] 方志,汪剑.预应力混凝土箱梁桥竖向预应力损失的实测与分析[J]. 土木工程学报, 2006(7): 78 -84.
Fang Zhi, Wang Jian. Vertical Prestressing Loss in the Box Girder of Long-span PC Continuous Bridges[J]. China Civil Engineering Journal, 2006(7): 78-84.
[ 3 ] 陈礼彪.下白石特大桥竖向预应力钢筋施工工艺与测试[J]. 公路, 2003(9): 21 -22.
Chen Libiao. Construction Technique and Test on Vertical Prestressed Reinforcement of Xiabaishi Extra-long Span Bridge[J]. Highway, 2003(9): 21-22.
[ 4 ] 杜官民,陈爱萍.混凝土结构竖向预应力筋锚固应力损失的控制[J]. 桥梁建设, 2006(增刊1): 94 -97.
Du Guanmin, Chen Ai-ping. Control of Anchoring Stress Loss of Vertical Prestressing Bar for Concrete Structure[J]. Bridge Construction, 2006 (Supplement 1):94 -97.
[ 5 ] 沈明燕,钟新谷,舒小娟.箱梁桥竖向预应力张拉工艺与张拉时机的研究[J].施工技术, 2007(10): 38 -40.
Shen Mingyan, Zhong Xingu, Shu Xiaojuan. Research on Tension Technique and Stretching Tim e of Vertical Prestress in a Bridge with Box Girder[J]. Construction Technology, 2007(10): 38 -40.
[ 6 ] 邱乐勋,蔡佳航.竖向预应力筋锚固过程的应力损失控制[J]. 广东交通职业技术学院学报, 2007(2): 35 -37.
Qiu Lexun, Cai Jiahang. Stress Loss Control of Vertical Prestress in the Course of Anchoring[J]. Journal of Guangdong Communications Polytechnic, 2007(2): 35 -37.
[ 7 ] 沈明燕,钟新谷,舒小娟.混凝土箱梁悬臂施工竖向预应力筋滞后张拉的研究[J]. 公路, 2007(1): 68 -71.
Shen Mingyan, Zhong Xingu, Shu Xiaojuan. Research on Delay Tensioning of Verticle Prestressed Reinforcements in Cantilever Construction of Box Concrete Girder[J]. Highway, 2007(1): 68 -71.
[ 8 ] 林玉森,张运波,强士中.宽桥面挂篮设计与悬灌施工技术[J]. 铁道工程学报, 2006(2): 45 -48.
Lin Yusen, Zhang Yunbo, Qiang Shizhong. Suspended Basket Design of Wider Bridge and Technique of Cantilever Construction[J]. Journal of Railway Engineering Society, 2006(2): 45 -48.
[ 9 ] 马润平,卫军,高宗余.大跨预应力混凝土梁式桥后期下挠原因分析[J]. 铁道工程学报, 2007(5): 53 -56.
Ma Runping, Wei Jun, Gao Zongyu. Analysis of the Cause for Post Down-warping of Large Span Prestressed Concrete Beam Bridge[J]. Journal of Railway Engineering Society, 2007(5): 53 -56.
[ 10 ]刘名君,鄢勇,唐向东.遂渝线无砟轨道综合试验段桥涵总体设计[J]. 铁道工程学报, 2007(增刊1): 220 -224.
Liu M ingjun, Yan Yong, Tang Xiangdong. Overall Design of Bridge and Culvert in Integrated Experimental Section for Ballastless Track of Suining-Chongqing Railway[J]. Journal of Railway Engineering Society, 2007(Supplement 1): 220-224.
|
|
|
|