Observation, Analysis and Suggestion to the Foundation Settlement of Bridges and Culverts of Harbin-Dalian Passenger Dedicated Line |
YANG Ji-xin, LI Jia-ming |
Wuhan University of Technology, Wuhan, Hubei 430063, China |
|
|
Abstract Research purposes:Through the analysis and evaluation of the dynamic observation of the post-construction systematic settlement of the railway bridge and culvert and the observed data on the actually tested settlement, the completion time of the final foundation settlement of bridges and culverts is evaluated, and the paving time of the ballastless track is determined reasonably to ensure the paving quality of the ballastless track of Passenger Dedicated Line. To the special situation encountered in the settlement observation, some suggestions are put forward for providing the reference to the similar works.
Research conclusions:From the observation of the settlement of Yunliang Grand Bridge of Harb in-Dalian Passenger Dedicated Line, and the analysis and evaluation of the settlement observed data, it is concluded by using curve fitting of the curve analysis method that the fitting result of double curves conforms to the real situation of Yunliang Grand Bridge, the stainless steel spiral observation mark should be used and four observation marks should be separately installed on four corners on both sides of the bridge pier, and the repeated observation should be conducted to the benchm ark (at least one CPI point or one CPII point) at fixed time by the same device and same method for improving the settlement observation accuracy.
|
Received: 27 October 2009
|
|
|
|
|
[ 1 ] 中铁二院工程集团有限责任公司. 高速铁路工程测量规范(报批稿) [Z]. 北京:中国铁道出版社, 2009.
China Railway Eryuan Engineering Group Co. Ltd. Code for Engineering Survey of High Railway[Z]. Beijing: China Raiway Publishing House, 2009.
[ 2 ] 闫希文. 郑西客运专线桥涵基础沉降观测方法[J]. 桥梁建设, 2008(1): 80-83 .
Yan Xiwen. Observation Method for Foundation Settlement of Bridges and Culverts of Zhengzhou-Xian Passenger Dedicated Railway[J]. Bridge Construction, 2008(1):80-83.
[ 3 ] 黄声享. 变形监测数据处理[M]. 武汉:武汉大学出版社, 2003 .
Huang Shengxiang. Data Processing of Deformation Monitoring[M]. Wuhan:Wuhan University Press, 2003 .
[ 4 ] JG J8 2007, 建筑变形测量规范[S].
JG J8 2007, Code for Deformation Measurement of Building and Structure[S].
[ 5 ] 江忠贵, 盛黎明. 铁路客运专线桥梁工程技术及建议[J]. 铁路工程学报, 2008(增刊1):40-52.
Jiang Zhonggui, Sheng Liming. Technology and Suggestions on the Bridges on Passenger Dedicated Line[J]. Journal of Railway Engineering Society, 2008(Supplement 1):40-52.
[ 6 ] 陈永奇. 变形观测数据处理[M]. 武汉:武汉大学出版社, 1988 .
Cheng Yongqi. Data Processing of DeformationObservation[M]. Wuhan:Wuhan University Press, 1988.
[ 7 ] 李结元, 圣少兵. 武广客专线新广州站桥梁工程沉降观测方案[J]. 铁道勘察, 2007(5): 44-46.
LI Jieyuan, Sheng Shaobing. Procedure for Observation on Bridge Engineering Settlement of New Guangzhou Railway Station in Wuhan-Guangzhou Passenger Dedicated Line[J]. Railway Investigation and Surveying, 2007(5): 44-46 .
[ 8 ] 丁愿文. 京津城际铁路桥梁沉降观测与评估技术[J].中国工程科学, 2009(11):43-47.
Ding Yuanwen. Technology on Settlement Monitoring and Evaluation in Bridge Pier in Beijing-Tianjin Intercity Railway[J]. China Engineering Sciences, 2009(11):43-47.
|
|
|
|