Application of TSP 203 in Tunnel Construction |
WANG Bing-di |
Southwest Construction Headquarter, China Railway 24th Bureau Group Co.Ltd. , Chengdu, Sichuang 610031,China |
|
|
Abstract Research purposes:Taihang Mounta in Tunnel is pressing in construction schedule and complicated in topographic and geologic conditions . To ensure the tunnel completion in time and speed up the construction process, this paper researches the usage methods, working contents, working procedures and data analysis methods of the advanced prediction and forecast technology TSP 203 for rapid and accurate surveying the engineering geological and hydrogeological conditions ahead of the tunnel.
Research conclusions:TSP 203 can accurately predict the nature, location and scale of the rock body in the area of 100-150 m ahead of the tunnel, especially the unfavorable geology, such as karst caves, fault zone and fracture zone. Application of TSP 203 in tunnel construction can reduce the blindness in tunnel construction, effectively prevent the appearances of the unfavorable geological disaster and construction accidents, and speed up the construction progress.
|
Received: 15 December 2009
|
|
|
|
|
[ 1 ] 关宝树. 隧道工程施工要点集 [M ] . 北京: 人民交通出版社, 2003.
Guan Baoshu, Tunnel Construction Elements of Sets[M] . Beijing: Peoples' Communications Press , 2003.
[ 2 ] 何民亮, 等. 隧道地质超前预报 [ M ]. 成都: 西南交通大学出版社, 2006.
He Minliang , etc. The Tunnel Geological Prediction[M]. Chengdu: Southwest Jiaotong University Press , 2006 .
[ 3 ] 铁道第三勘察设计院. 石太线太行山隧道设计施工图[ Z]. 天津: 铁道第三勘察设计院, 2005.
Third Survey and Design Institute of Ministry of Railways , Shijiazhuang-Taiyuan Line of Taihang Mountain Tunnel Design and Construction Plans[Z]. Tianjin: Third Railway Sunvey and Design Institute of Ministry of Railways , 2005.
[ 4 ] 丁恩保, 凌荣华, 马继平. 隧道工程地质预报方法探讨[ J] . 工程地质学报, 1995( 1): 28- 34.
Ding Enbao , Ling Ronghua , Ma Jiping. Method of Tunnel Geological Prediction [J]. Journal of Engineering Geology , 1995 (1): 28- 34.
[ 5 ] 罗伟新. 单界面反射的反射波法频率域解释方法的研究[ J] . 地球物理学报, 1997( 4): 570- 579.
Luo Weixin. Single-interface Reflection of the Reflected Wave Method in Frequency Domain Interpretation of the Study[J]. Journal of Geophysical, 1997(4): 570- 579.
[ 6 ] 何振起, 李海, 梁彦忠. 利用地震反射法进行隧道施工地 质超前预报 [ J] . 铁道工程学报, 2000( 4): 86- 90.
He Zhenqi, Li Hai, Liang Yanzhong. Using Seismic Reflection Method for Tunnel Construction Geological forecasting[J]. Journal of Railway Engineering Society, 2000(4): 86- 90.
[ 7 ] 李忠, 刘秀峰, 黄成麟. 提高 TSP - 202 超前预报系统探测距离的技术措施的研究 [ J]. 岩石力学与工程学报,2003( 3): 130- 133 .
Li Zhong, Liu Xiufeng, Huang Chenglun. Improve Early Warning System Ahead of TSP-202 Detection Range of Technical Measures for Research[J]. Journal of Rock Mechanics and Engineering, 2003 (3): 130-133.
|
|
|
|