铁道工程学报  2005, Vol. 22 Issue (2): 27-30    DOI:
Current Issue | Archive | Adv Search |
TEMPERATURE AND CRACK CONTROL TECHNOLOGY FOR LARGE -VOLUME CONCRETE IN CONSTRUCTION OF BRIDGE TRESTLE
ZHAO Guo-li
The Third Engineering Bureau Group Co. Ltd. of Chinese Railway
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech