Abstract Research purposes: The research is done on how to reasonably select railway route atvery beginning of the construction for achieving the goal of scientific prevention ofearthquake and reduction ofdisaster.
Research conclusions:(1)When the railway route selection is conducted in high seismic intensity region, especially around faultzone, the track should pass through the highly intense earthquake region in parallel outside of the fault zone, andwhen the track has to pass through the faultzone, itshould pass through the faultzone vertically asmuch as possible and the inverted slope around the tunnel port should not be vertical to the fault zone. (2)The railway track should keep away from the areawhere lots of rocksmay fall in wide range. (3) The track should keep away from the fault zone asmuch aspossible. If the track has to pass through the faultzone, itshould pass the narrow area of the fault zone with low subgrade and low bridge. (4)When the track passes through valley, the reasonable track elevation should be selected on consideration to the potential unfavorable factors, such as barrier lake, unstable sliding body, sliding slope, talus andmudflow. (5)When the railway construction is conducted adjacent to the unstable slope to affect the construction safety, the comparison should bemade between the plan of reinforcing the unstable slope and the plan of the track keeping away from the unstable slope. (6) When track passes through the high seismic intensity region, more tunnels should be buil,t and less bridge and road structure should be buil.t (7) No or less bridge in steep slope and nearmountain, road structure and small curve radius track should be buil,t especially in unfavorable geological area.
|
Received: 14 May 2009
|
|
|
|
|
[1] TB 2005)2006,铁路路基支挡结构设计规范[S].
[2] 葛根荣.大理至瑞丽铁路选线的防灾减灾原侧[J].四川建筑, 2006(4), 50 -51.
[3] 中铁二院工程集团有限责任公司.汶川地震工程震害调查及铁路工程抗震设计标准研究[R ].成都:中铁二院工程集团有限责任公司, 2008.
[4] 郝瀛.铁路选线设计[M ].北京:中国铁道出版社, 1988.
[5] 李建国,褚宇光,等.汶川地震铁路路基工程震害调查与分析[J].铁道工程学报, 2008(增刊): 91 -95.
[6] 李安洪,刘洋,等.广岳铁路路基震害分析与对策[J].铁道工程学报, 2008(增刊): 298 -303.
[7] 高志伟.地震灾害对山区铁路路基工程的影响与对策研究[J].铁道工程学报, 2008(12): 15 -17.
[8] 朱颖,魏永幸.铁路工程震害特征分析与研究综述[C] //宋胜武.汶川大地震工程震害调查分析与研究.北京:科学出版社, 2009: 555 -558.
[9] 李建国,褚宇光.铁路路基震陷调查及防治措施初探[C] //宋胜武.汶川大地震工程震害调查分析与研究.北京:科学出版社, 2009: 619 -624.
[10]冯俊德,姚令侃,王智猛.强震区路基工程震害模式与分析[C] //宋胜武.汶川大地震工程震害调查分析与研究.北京:科学出版社, 2009: 630 -637.
|
|
|
|