Application of Geological Forecast in Construction of Q ipanshi Karst Tunnel |
LUO Li-rui1,LIU Zhi-gang2,YAO Hai-bo1,ZHANG Zhi-bo1 |
1. China Jingye Engineering Corporation Limited,Beijing100088,China;2. Shi jia zhuang Railway Institute,Sh ijia zhuang,Hebei 050043,China |
|
|
Abstract Research purposes: The karst tunnel easily becomes the place where the geological disasterhappens during construction of karst tunne,l such as water -inrush and mud -inrush, due to its complexity, changeability and uncertainty. Atpresen,t it isdifficult to accurately forecast the type, position and size of the unfavorable geologicalbody in front of the tunne.l So it is urgent to improve the accuracy of the geological forecast in order to decrease the construction costand casualties asmuch as possible in karst tunnels construction.
Research conclusions:(1)The characteristics and mechanical properties of the karst caves ofQipanshi Tunnel are analyzedwith geological knowledge, and the location and size of the caves in the leftside of tunnelwall are speculated.(2)The ground probing radar is used to probe the left side of tunnelwall and the tunnel bottom, and the probing result shows thata large karst cave exists in the left side of the tunnel and it conforms to the speculated results, except the deviation in position. The reasons for the deviation are analyzed. (3)The comprehensive geological knowledge and geophysical equipmentare two necessary conditions to do the geological forecast perfectly.
|
Received: 29 July 2009
|
|
|
|
|
[1] 何振起,李海,梁彦忠.利用地震反射法进行隧道施工地质超前预报[J].铁道工程学报, 2000(4): 81 -85.
[2] 李忠,刘秀峰,黄成麟.提高TSP -202超前预报系统距离的技术措施的研究[J].岩石力学与工程学报, 2003(3): 472 -475.
[3] 陈建峰.隧道施工地质超前预报技术比较[J].地下空间, 2003(1): 5 -9.
[4] 吴俊,毛海和,应松,等.地质雷达在公路隧道短期地质超前预报中的应用[J].岩土力学,2003(增1):154 -157.
[5] 王鹰,陈强,魏有仪,等.红外探测技术在圆梁山隧道突水预报中的应用[J].岩石力学与工程学报, 2003(5):855 -857.
[6] 袁真秀.红外探测技术在圆梁山隧道的应用效果分析[J].隧道建设, 2004(5): 6 -8.
[7] 张庆欣. HY -303红外探测技术在齐岳山隧道的应用[J].铁道建筑, 2006(8): 38 -39.
[8] 刘志刚,赵勇.隧道隧洞施工地质技术[M ].北京:中国铁道出版社, 2001.
[9] 孙殿卿,高庆华.地质力学与地壳运动[M ].北京:地质出版社, 1982.22 铁 道 工 程 学 报2009年11月
|
|
|
|