Research on the Design ofRailway Tied Arch Bridge |
ZHU Min,WANG Yu-jue,YANG Yong-yi, WANG Jue |
China Railway Eryuan EngineeringGroup Co. Ltd, Chengdu,Sichuan 610031,China |
|
|
Abstract Research purposes: As the tie -arch bridge uses tie bar to bear the push force of the arch, so it is one of reasonable bridge types under the condition the bridge height is limited or the bridge site lies in the unfavorable geological area. The supermajoroverpass on the 3rd ring road in Chengdu is the first and largest large -span double track railway prestressed concrete tied arch bridge inChina. In thispaper, the research isdonemainly on the structural features and the characteristics of force bearing capacity of such tied arch bridge for instructing the construction.
Research conclusions:The the static and dynamic analysesof the supermajoroverpasson the 3rd ring road in Chengdu show that all indexes of the bridge meet the code requirements. As the bearing force at joint point of arch beam is complicated, the three -dimensional prestressed structure should be designed, the beam end ofmain beam should be widened and heightened, andwebs should be thickened. The stress concentration happens in some partsbecause of the complicated structure. Based the research and calculation, the applicable range of tied arch structure in construction of railway bridge iswidened by adopting new scientific research achievements and theories athome and abroad and it can provide the reference to the similar works.
|
Received: 23 June 2009
|
|
|
|
|
[1] 李国豪.桥梁结构稳定与振动[M ]. 2版.北京:中国铁道出版社, 2002.
[2] 项海帆.高等桥梁结构理论[M ].北京:人民交通出版社, 2001.
[3] 朱伯芳.有限元法原理与应用[M ].北京:中国水利水电出版社, 1998.
[4] 范立础.桥梁工程?下册[M ].北京:人民交通出版社,2001.
[5] 范立础.桥梁工程?上册[M ].北京:人民交通出版社,2001.
[6] 王国强.实用工程数值模拟技术及其在ANSYS上的实践[M ].西安:西北工业大学出版社, 1996.
[7] 常大民,江克斌.桥梁结构可靠性分析与设计[M ].北京:中国铁道出版社, 1995.
[8] 魏建.成都枢纽三环立交双线铁路系杆拱桥设计研究[J].铁道标准设计, 2006(2): 36 -38.
[9] 曹相和.铁路双线预置拼装式钢筋混凝土系杆拱桥施工技术[J].铁道工程学报, 2005(2): 31 -33.
[10]裴若娟.高速铁路提篮拱桥拱脚应力分析[J].铁道工程学报, 2002(1): 23 -29.
[11]梁学明.西康线豁口特大桥42 m系杆拱设计施工方案优选[J].铁道工程学报, 2001(3): 48 -55.
[12]陈列.高速铁路下承式结合梁系杆拱桥桥面结合方式[J].铁道科学研究, 2007(9): 37 -42.
|
|
|
|