|
|
Research on the Numerical Smiulation of Subsidence of Existing Tunnel Caused by Adjacent Metro Tunnel Construction in Shenzhen |
ZHANG Hui-gang1, JIANG Zhi-ling2, ZHANG Yu-wei1 |
1. China Railway Eryuan Engineering Group Co. Ltd, Chengdu, Sichuan 610031, China; 2. Southwest Petroleum University, Chengdu, Sichuan 610500, China |
|
|
Abstract Research purposes: The process is simulated for construction of ametro tunnel adjacent to existing tunnel in Shenzhen with FLAC3D software and the discussions are made on the surrounding stratum displacement, the existing tunnel subsidence, ground subsidence, the safety of the new tunnel and the adjacent metro tunnel.
Research conclusions:Under this geological condition and specially pushing force of shield, the maximum of the ground subsidence is12. 9 mm, and the maximum rise value of ground is0. 7 mm.They satisfy the design requirements. After the completion of the existing tunnel and taking some measures, the corresponding consolidated subsidence value is 1. 8 mm. Thewidth of subsidence slotunder the tunnel floor is 60 m. The subsidence curve is relatively fla,t which satisfies the lateral differential subsidence demand of the existing tunnel.
|
Received: 16 December 2008
|
|
|
|
|
[1] 曹俊发.有限元数值模拟预控地表沉降在大断面地铁隧道中的应用[J].铁道建筑, 2005(9): 42 -44.
[2] 吕勤.地铁隧道暗挖施工中土层特性对地层变形的影响分析[J].现代隧道技术, 2005(2): 29 -31.
[3] 章玉伟,等.深圳地铁福市区间初步设计报告[R ].深圳:中铁二院成都地勘岩土公司, 2007.
[4] 黄俊,张顶立.地铁重叠隧道上覆地层变形的数值模拟[J].岩石力学与工程学报, 2005(12): 2179 -2182.
[5] 俞鑫风,王健.地铁隧道近接施工相互影响研究现状及其思考[J].北京建筑工程学院学报, 2008(3): 30 -34.
[6] 郑保才,程文斌,胡国伟.浅埋暗挖法施工近接交叉地铁隧道地表沉降监测分析[J].铁道工程学报, 2009(1): 72 -76.
[7] 范国文,王先堂.暗挖双连拱隧道穿越浅基础高层楼群区施工技术[J].铁道工程学报, 2003(3): 109 -115.
[8] 李国和,孙树礼,许再良,等.地面沉降对高速铁路桥梁工程的影响及对策[J].铁道工程学报, 2008(4): 37 -41.
[9] 胡国伟.复杂条件下超大跨地铁车站施工仿真技术研究[J].铁道工程学报, 2007(9): 87 -90.
[10]刘辉.浅埋暗挖法修建地下工程应用分析[J].铁道工程学报, 2005(2): 38 -40.
[11]吴波,刘维宁,索晓明,等.地铁施工近邻桥基加固效果三维数值分析[J].铁道工程学报, 2005(5): 48 -52.
|
|
|
|