|
|
Research on the Control of Track Irregularity of High—speed Railway |
LI Ming—hua1,LI Li—lin2,HE Xiao—yuan3 |
1.East China Jiaotong University,Nanchang,Jiangxi 330013,China;2.The Shimen—Changsha Railway Co.Ltd of Guangzhou Railway Group,Changsha,Hunan 41 0007,China;3.Guangzhou Railway Terminal ConstruCtion Headquarter of Guiyang—Guangzhou Railway,Guangzhou Railway Group,Guangzhou,Guangdong 510600,China |
|
|
Abstract Research purposes: Rapidity,comfort and safety are the three major elements of high—speed railway transportation.Because of the complicated interaCt ion of train and track,the uncontrolled geometric shape of track will lead to the changes between the geometric shape and location of the track.Such changes will bring about the changes of the geometric shape and location of the track and the designed track shape and make the track irregularity,which will affect the safety and the comfort of train.By using the track irregularity value as an incentive,this paper offered the motion equation through the establishment of vertical vibration trains vehicle model on orbit with consideration of the flexibility of track struCI ure,solved the quality matrix,stiffness and damping matrix of the system by using the transform matrix method along with Newmark integration method after Matlab programming,and put forward the vertical acceleration of train and high—low values of track irregularity.
Research conclusions: Through establishing the train model and solving the motion equation,this paper discussed the impaction of the track irregularity on vertical acceleration of train,and with the comparison of the relevant standards at home and abroad,presented the biggest high—low values of track irregularity to meet the requirements when the train speed reached at 300 km/h.Namely,when the vertical acceleration of train can meet the irregular comfortable value of 0.15g,the high—low value of track irregularity could be controlled within 8 mm.When the vertical acceleration of train can meet the maintenance target value of 0.25 g,the high—low value of track irregularity could be controlled within 14 mm.When the vertical acceleration of train can meet the safety management target value of 0.35 g,the high—low value of track irregularity could be controlled within 19 mm.
|
Received: 27 June 2009
|
|
|
|
|
[1]雷晓燕.轨道力学与工程新方法[M].北京:中国铁道出 版社,2002.
[2] 张定贤.机车车辆轨道系统动力学[M].北京:中国铁道 出版社,1996.
[3] 练松良.轨道动力学[M].上海:同济大学出版社,2003.
[4] 罗林.轮轨系统轨道平顺状态的控制[M].北京:中国铁 道出版社,2006.
[5] 雷晓燕,仲志武.高速铁路无砟轨道振动分析[J].铁道 工程学报,2009(1):36—40.
[6] 冯青松,雷晓燕,等.不平顺条件下高速铁路轨道振动的 解析研究[J].振动工程学报,2008,21(6):559—564.
[7] 陈宪麦,王澜,等.基于小波分析理论的轨道不平顺分析 [J].铁道工程学报,2008(1):56—61.
[8] 王贵春,潘家英.轨道不平顺导致的车桥耦合振动分析 [J].铁道工程学报,2006(8):30—33.
[9]雷晓燕,邓福清.客货混运铁路专线轨道振动分析[J]. 铁道工程学报,2007(3):16—20.
[10]林玉林,信丽华.短波激励下高速铁路桥上列车走行性 研究[J].铁道工程学报,2006(8):35—38.
|
|
|
|