Abstract Research purposes: This paper analyzes some problems presently existed in profile gradient design in the tunnel according to relevant provisions regarding profile grade design for tunnel section stipulated in current code for railway construction and proposes a profile gradient design method for tunnel section for the electrified mixed passenger and freight railway through analysis of influence factors of train additional resistance in tunnel section and relation between performance of locomotive,tonnage rating of train,train running resistance,and profile gradient of railway line.
Research conclusions: As a reference,the formula of additional resistance in tunnel,stipulated in explanation of code for Design of Railway:Electric Traction (TB 1 407—82),is available for design of tunnel section for mixed passenger and freight railway,but its simplified formula is seldom use.The gradient design for tunnel section only in accordance with Article 2 of Clause 3.2.5 in co如加r Design of Railway Line(GB 50090—2006)can not fully meet requirements of railway construction.Especially for the tunnels located in the section with severe topographical and geological conditions,the factors such as performance of locomotive,running speed of train and additional air resistance in tunnel should be considered to make full use of the mobile equipments,and the computer simulation technology should be adopted to determine the maximum profile gradient of tunnel section with formula of additional resistance in tunnel.
|
Received: 12 March 2009
|
|
|
|
|
[1] GB 50090)2006,铁路线路设计规范[S].
[2] 铁建设函[2005 ]285号,新建时速200公里客货共线铁 路设计暂行规定[S].
[3] 铁科技函[2006 ]747号,既有线提速200km /h技术条件 [S].
[4] TB 10003)2005,铁路隧道设计规范[S].
[5] TB /T 1407)1998,列车牵引计算规程[S].
[6] TB 1407)82,列车牵引计算规程[S].
[7] 唐伟强,张继清.天津地下直径线最大坡度研究[J].铁 道工程学报, 2008(2): 89 -93.
[8] 陈亮.贵阳至广州线线路最大坡度方案比选[J].铁道 工程学报, 2008(8): 18 -22.
[9] 毛保华,何天健,袁振洲,等.通用列车运行模拟系统研 究[J].铁道学报, 2000 ( l): 1 -10.
[10]毛保华.列车运行计算和设计[M ].北京:人民交通出版 社, 2008.
|
|
|
|