铁道工程学报  2009, Vol. 26 Issue (7): 80-83    DOI:
Current Issue | Archive | Adv Search |
Application of the Geological Prediction in Advance in Construction of Xiang’an Submarine Tunnel
LUO Li—rui1,LIU Zhi—gang2
1.China JINGYE Engineering Corporation Limited,Beijing 100088,China;2.Shijiazhuang Railway Institute,Shijiazhuang,Hebei 050043,China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech