铁道工程学报  2009, Vol. 26 Issue (7): 84-88    DOI:
Current Issue | Archive | Adv Search |
Researches on the Stability of Buildings above Shallow—buried Tunnel
GUO Hai—man1,LIU Cheng—yu2,YANG Jian—cheng1,LIN Hu—wang1
1.Engineering Construction Headquarters of Longyan—Xiaman Railway,Longyan,Fujian 364000,China;2.Fuzhou University,Fuzhou,Fujian 350108,China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech