Abstract Research purposes : The measured linear segmentation in existing railway,which would affect linear fitting and optimization, is the first step of retest calculation. Considering the shortage of low segmentation accuracy in existing retest segmentation process,we propose a new method for linear segmentation : first find the approximate location of pile point by using the method of approximate segmentation, then carry on accurate segmentation by fitting and iterating calculation.
Research conclusions :(1) Based on adjacent chord azimuth changes,the method of approximate segmentation can handle different curve radius measured data, and the result meets the requirement of fitting and iterating calculation.(2)By contrast of the segmentation results between measured data and design data,the method of plane accurate segmentation can achieve high segmentation accuracy.(3)By contrast of the segmentation results between measured data and design data, the method of vertical linear accurate segmentation is correct and the high accuracy can be achieved. (4) The research achievement can be applied in measured linear calculation,and has the reference value for linear adjustment in existing railway.
|
Received: 10 April 2014
|
|
|
|
|
[1 ] 覃庆既有线测量新技术[J].铁道工程学报,2007(2). 47 -50.
Qin Qing. The New Measuring Techniques for the Existing Railway [ J]. Journal of Railway Engineering Society,2007 ( 2) : 47 -50.
[2] 陈锋,辜良瑶,等.铁路既有续复测平面曲线优化方法 [J]. 铁道科学与工程学报,2012.(,5) :91 -95.
Chen Feng,Gu Liangyao, etc. Optimum Method for Horizontal Curve Re - surveying of the Existing Railway [J ]. Journal of Railway Science and Engineering,2012(5) :91 -95.
[3]陈海军. 既有线有碎轨道优化线形算法研究及其软件研制[D].西南交通大学,2013.
Chen Haijun. Study of Algorithm on Optimization Design of Existing Railway Ballast Track and Software Development [ D ]. Southwest Jiaotong University, 2013.
[4]丁克良,欧吉坤,赵春梅.正交最小二乘曲线拟合法 [J]测绘科学,2007(3) :18 - 19.
Ding Keliang,Ou Jikun,Zhao Chunmei. Methods of the Least - squares Orthogonal Distance Fitting [ J ] . Science of Surveying and Mapping,2007(3) :18 -19.
[5]覃辉.缓和曲线要素公式的精度分析[J].勘察科学技术,2009(3) :18 -21.
Qin Hui. Precision Analysis of Spiral Elements Formulae [J]. Site Investigation Science and Technology,2009 (3) :18-21.
[6]王兆祥.铁道工程测量[M].北京:中国铁道出版社, 2003.
Wang Zhaoxiang. Railway Engineering Survey [ M ] . Beijing: China Railway Publishing House,2003.
[7]张正禄.工程测量学[M].武汉:武汉大学出版社,2003. Zhang Zhenglu. Engineering Survey [ M ] . Wuhan : Wuhan University Press,2003.
|
|
|
|