Research on the Capacity of NSl 003 Railway Crane Running on Railway |
LIU Zhen - ying |
China Railway Wuhan Bridge Industries limited, Wuhan, Hubei 430052,China |
|
|
Abstract Research purposes : As a special lifting equipment,railway crane speed in train marshalling and towing state has a great significance for railway rescue. NS1003 railway crane is taken as the object of study, when it runs through the railway bridges along the way in marshalling and towing state, the effect of axle load and wheelbase changing on running speed on bridges is analyzed, to provide analysis method for railway crane design in the future.
Research conclusions : When the main structure and gravity center position of the crane are confirmed, the bogie wheelbase can be adjusted to improve its echo performance. If the product design cycle is short, first design the whole machine structure, finally adjust the parameters of the crane to improve its echo performance. If the product design cycle is long, constantly optimize the crane design, use the method which adjusting the weight and gravity center location of the crane and crane bogie wheelbase and axle load, to get ideal crane echo performance.
|
Received: 14 December 2013
|
|
|
|
|
[1 ]铁运函[2004] 120号,铁路桥梁检定规范[M].
. 铁运函[2004 ] No. 120,Code for Rating Existing Railway Bridges [ M].
[2] TB 10002.1-2005,铁路桥涵设计基本规范[M].
TB 10002. I-2005, Fundamental Code for Design on Railway Bridge and Culvert [ M].
[3] TB 10621 —2009,高速铁路设计规范(试行)[M].
TB 10621—2009, Code for Design of High Speed Railway [ M] .
[4] TB/T 3081—2003,内燃铁路起重机技术条件[S].
TB/T 3081—2003,Technical Specification for Diesel Locomotive Crane[ S] .
[5] 刘振营,杜斌武,王炜,等.NS125型铁路起重机整体结构有限元分析[J].铁道工程学报,2009(9);87-89.
Liu Zhenying, Du Binwu, Wang Wei,etc. Finite Element Analysis of Overall Structure of the NSl25 Railway Crane [ J ]. Journal of Railway Engineering Society,2009(9) :87 -89.
|
|
|
|