Design of Interval Signal for Continued Project of Dalian Rapid Rail Line 3 |
WANG Hai-tao |
The Third Railway Survey and Design Institute Group Corporation, Tianjin 300251, China |
|
|
Abstract Research purposes:Through analyses of the route plan and profile of the continued project of Dalian rapid rail line 3 and in combination with the carrying capacity of the line requirement and signal equipment as well as according to the passenger volume requirement, the traction simulation calculation is made, and based on the calculation results, the transportation capacity and reasonable divisional location of signal are designed for the purpose of guaranteeing the safety of the train on the No.3 rapid rail line.
Research conclusions:Through the simulation calculation, the highest train speed of the No.3 rapid rail line is 79 km/h and the biggest braking distance is 657 m. However, considering the necessary safe distance, the maximum blocking section length will be 700m that can satisfy the requirement of train operation, and considering the requirements of the train returning and the train speed, the minimum blocking section length around the kaifaqu Station will be 200m that can satisfy the requirement. With fixed automatic block, the speed grade of signal equipment should be consistent with the train speed without limitation of the normal train operation for increasing the train speed.
|
Received: 14 November 2008
|
|
|
|
|
[ 1 ] GB 50157—2003, 地铁设计规范[S].
[ 2 ] 建标[1999]81号,城市快速轨道交通工程项目建设标准(试行本) [S].
[ 3 ] 卫和君. 大连市快轨3号线施工图第九篇5信号系统6[Z]. 北京: 北京全路通信信号研究设计院, 2002.
[ 4 ] 王海涛, 赵昕. 行车组织与运营管理[R]. 天津: 铁道第三勘察设计院, 2005.
[ 5 ] 王印富, 雷志厚. 城市轨道交通行车组织方法的探讨[J]. 铁道工程学报, 2001(4): 59 -63.
|
|
|
|