Solution to the Control of Subgrade Settlement for Passenger Dedicated Line |
HAN Zhi-xia, CUI Jun-jie |
TheThird Railway Survey and Design InstituteGroup Corporation, Tianjin 300142, China |
|
|
Abstract Research purposes:The commonly-used design and treatment theory andmethod for the traditional softsoil foundations can notmeet the needs of the foundation consolidation treatment and design calculation of the post-construction settlementofpassengerdedicated line because the passengerdedicated line requires less post-construction settlement for its subgrade. This paper offers the solution to control of subgrade settlementofpassenger dedicated line.
Research conclusions:Themethod fordetermining the thickness of compressed layer is put forward throughmaking the analyses ofadvantages and disadvantagesof the allmethods in details. Based on the analysisof the load characteristicsof track, train and transporting girder vehicle and subgrade control factor of stabilization and settlemen,t the proposals are made to simplifying the load forms of track, train and transporting girder vehicle. Through the research on the different load transfer characteristics of foundation forms and formation conditions of composite foundation, it is pointed out the subgrade settlement control on passengerdedicated railway line should be conducted according to the cushion form of the embankmentbase and strengthening pile typeswith the composite foundation theory.
|
Received: 06 November 2008
|
|
|
|
|
[1] 屈晓辉,崔俊杰.客运专线铁路路基设计技术[M].北 京:人民交通出版社, 2008.
[2] 地基处理手册编委会.地基处理手册[K]. 3版.北京: 中国建筑工业出版社, 2008.
[3] JGJ 79)2002/J 220)2002,建筑地基处理技术规范[S].
[4] JGJ 94)2008,建筑桩基技术规范[S]
|
|
|
|