Abstract Research purposes:Aiming at the problems in design of loess tunnel on Zhengzhou-Xi 'an Passenger Dedicated Line, the studies are done on dividing height of deep and shallow submersion, computing method for surrounding rock pressure and design principle of secondary lining of large sectional loess tunnel for the purposes of directing the design and construction of the loess tunnel on Zhengzhou-Xia' n PassengerDedicated Line and providing the technical support to the similarworks.
Research conclusions:Based on the research on the ground cracks and surrounding rock pressure during the excavation of loess tunne,l the dividing line ofdeep and shallow submersion, computingmethod of surrounding rock pressure and designing principle ofsecondary lining of large sectional loess tunnelon Zhengzhou-Xia' n PassengerDedicated Line are presented. The dividingheightofdeep and shallow submersion of loess tunnelon Zhengzhou-Xia' n PassengerDedicated Line is40~60m, the loess tunnel load under shallow-buried condition can be calculatedwithXie Jiaxiu Formula, the loess tunnel load under deep-buried condition can be calculated with TerzaghiTheory and the thickness of secondary lining of loess tunnels under differentburied depth can be the same.
|
Received: 10 June 2008
|
|
|
|
|
[1] 中铁二院工程集团有限责任公司.郑州至西安客运专线 黄土隧道合理支护参数科研报告中间成果[R].成都: 中铁二院工程集团有限责任公司, 2007.
[2] 梁文灏,等.郑州至西安客运专线大断面黄土隧道设计 与施工技术要点[C]M2006年中国高速铁路隧道国际技 术交流会论文集.北京:中国铁道出版社,2006:147-161.
[3] 丁维利,王晓州,朱永全,等.郑州至西安客运专线黄土 隧道施工地表裂缝调查分析[ J].铁道标准设计, 2007 (增1): 87-89.
[4] 长安大学公路学院.大断面黄土公路隧道施工及监控技 术研究[R].西安:长安大学公路学院, 2005.
|
|
|
|