Research on the CPóM easurement Technology for Flat-track and Its Expenditure |
LI Cheng-dong |
Economic and PlanningResearch Institute of theMinistry ofRailways, Tianjin 300142, China |
|
|
Abstract Research purposes:The flat-track is commonly adopted in passenger dedicated line in China. The CPó measurement is essential to guaranteeing the track regularity ofpassengerdedicated line, so it is a very important factor to passenger dedicated line. Based on the research on the CPó'smeasurement technology and site investigation, this paper analyzes the expenditure constitution and makes calculation of the expenditure of the CPómeasurement in accordancewith the related technical specifications and the existing expenditure standards issued by the Ministry of Railways for the purpose ofproviding the basis for defining the expenditure of themeasuremen.t
Research conclusions:Based on the research and analyses, themeasuring step, working conten,t allocations ofperson and equipment andworking efficiency ofCPómeasurement for flat-track are presented and the engineering economic ndex is given in thispaper. Through the preliminary calculations, the related expenditure ofnetCPómeasurement for flat-track is 13, 300 Yuan RMB per km on main line and the expenditure of repetition measurements is 9, 300 Yuan RMB.
|
Received: 22 October 2008
|
|
|
|
|
[1] 何华武.论时速大于200 km铁路精密工程测量技术 [J].中国铁路, 2007(3): 1-4.
[2] 吴明友.客运专线无碴轨道铁路工程测量和铺设条件评 估关键技术[J].中国铁路2006(10): 28-31.
[3] 何华武.无碴轨道技术[M].北京:中国铁道出版社, 2005.
[4] 铁建设函[2005]754号,客运专线无碴轨道铁路设计指 南[S].
[5] 铁建设函[2006]158号,客运专线铁路无碴轨道铺设条 件评估技术指南[S].
[6] 铁建设[2006]189号,客运专线无碴轨道铁路工程测量 暂行规定[S].
|
|
|
|