|
|
Impacts of Successive Route upon Passing Capacity of High-speed Railway |
XIE Min |
The Third Railway Survey and Design Institute Group Corporation,Tianjin 300251,China |
|
|
Abstract Research purposes: As stipulated in‘Computer Interlocking System Technical Conditions(TB/T 3027- 2002),a successive route should be provided at the end of vehicle access route for the station with a down grade of 6‰ converted within the braking distance outside the home signal. When there is catch siding or separation facility at the end of an access route,the successive route should be set towards and linked to the siding or the facility; If there is not, to the main track instead. In China, there are some stations with a down grade of 6‰ converted within the braking distance outside the home signal. According to the regulations,the successive route should be provided. As successive routes would have great impacts on the passing capacity of high-speed railway stations,the study about the passing capacity is necessary. This article makes a system analysis on the impacts,which may be caused by providing successive access routes on high-speed railways,upon the arrival-arrival interval,arrival-running through interval,arrival-departure interval and arrival-departure interval of stations.
Research conclusions:(1)Based on the studies,successive routes would have great impacts on the passing capacity of high-speed railway stations and the arrival intervals at stations increase by more than 2.3 min and so do the arrival-running through intervals.(2)Setting catch sidings concurrently is not an effective solution either, so setting catch sidings is not necessary.(3)The research results have a reference for the stations design and the passing capacity analysis of high-speed railway.
|
Received: 06 March 2014
|
|
|
|
|
[1]TB 10621-2009,高速铁路设计规范(试行)[S].
TB 10621-2009,Code for Design of High Speed Railway (Trial)[S].
[2]王强.高速铁路延续进路的设计分析[J].中国铁路, 2009(11);6-8.
Wang Qiang. Analysis and Design of High Speed Railway Extension Route[J].China Railways, 2009. (11) ;6-8.
[3]沈志凌.客运专线铁路是否需要设置6‰下坡道延续进路的探讨[J].铁道工程学报,2009(6);103-106.
Shen Zhiling. Exploration on Whether or not to Set Successive Route for 6‰ Descending Grade on Passenger Dedicated Line[J].Journal of Railway Engineering Society, 2009(6) ;103-106.
[4]周杰,李富山,张保银.大列通过下坡道延续进路后进路 解锁的方法[J].铁道通信信号,2009(9);40-40.
Zhou Jie,Li Fushan, Zhang Baoyin. Unlock Methods of Large Train through Descending Grade Successive Route[ J].Railway Signalling&Communication, 2009 (9) ;40-40.
[5]傅世善.关于下坡道延续进路的来龙去脉[J].铁路通 信信号工程技术,2006(3):58-60.
Fu Shishan. The Sequence of Events of Descending Grade Successive Route[J].Railway Signalling& Communication Engineering, 2006 ( 3 ) ; 58-60.
[6]曹春雷.一个坡道延续进路问题的处理[J].铁道通信 信号,2009(3);31-32.
Caochunlei. Processing a Grade Successive Route Problem[J].Railway Signaling & Communication, 2009(3);31-32.
[7]郭永红.6‰下坡道延续进路设计问题分析[J].铁道通 信信号,2007(9):26-26.
Guo Yonghong. 6%o Descending Grade Successive Route Design Problem Analysis[J].Railway Signaling& Communication , 2007 ( 9 ) ; 26-26.
[8]柴建华.浅谈‰下坡道延续进路设计[J].铁道通信信 号,2004(1);43-43.
Chai Jianhua. Discussion on the 6%o Descending Grade Successive Route Design[J] .Railway Signalling& Communication , 2004 (1) ; 43-43.
[9]李庆生.客运专线车站设备布置的探讨[J].铁道标准 设计,2006 ( z1):132-135.
Li Qingsheng. Discussion of Passenger Station Layout of Equipment[ J].Railway Standard Design, 2006(z1): 132-135.
[10]刘琦.车站内连续6‰下坡道问题的处理[J].铁道通信 信号,2011(11);25-26.
Liu Qi. Processing Station for 6%o Consecutive Lower Ramp Problem[J].Railway Signaling& Communication,2011(11) ;25-26.
|
|
|
|