[3] |
张珂,肖连山,阎建斌.张唐铁路承德至唐山段线路走向 方案研究[J].铁道工程学报,2009(12);1-4.
|
|
Jiao Heng. Discussion on the Planning and Railway Construction in Yancheng Region[J].Railway Construction Technology , 2013 (10 ):1-5.
|
[2] |
中铁第五勘察设计院集团有限公司连镇线连淮段可研 评估报告[R].北京:中铁第五勘察设计院集团有限公 司,2014.
|
|
Li Bing. Evaluation on the Plans of Introducing Passenger Dedicated Line into Railway Terminal[J]. Railway Transport and Economy , 2007 (3): 88-91.
|
|
China Railway Fifth Survey and Design Institute Group Co. Ltd. The Feasibility Study Report of Lianhuai Section in Lianzhen Railway [R].Beijing: China Railway Fifth Survey and Design Institute Group Co. Ltd ,2014.
|
[1] |
GB 50090—2006,铁路线路设计规范[S].
|
[5] |
矫恒.盐城地区铁路建设规划探讨[J].铁道建筑技术, 2013(10):1-5.
|
|
GB 50090—2006,Code for Design of Railway Line [ S ].
|
[4] |
李冰.客运专线引人铁路枢纽的方案评价[J].铁道运输 与经济,2007(3):88-91.
|
|
Zhang Ke, Xiao Lianshan, Yan Jianbin. Research on the Program for Line Trend in Section between Chengde and Tangshan of Zhangjiakou-Tangshan Railway[J]. Journal of Railway Engineering Society, 2009(12): 1-4.
|