|
|
Schemes Analysis and Main Engineering Geological Problems in Caohai of Dianchi Lake |
LIU Wei, YANG Wen-hui , ZHAO Fu-yu , SU Hong-yi |
Kunming Survey,Design and Research Institute Co. Ltd. of CREEL,Kunming,Yunnan 650200,China |
|
|
Abstract Research purposes: Caohai is an important part of Dianchi lake,Caohai and transportation construction in the southwest of Kunming city have a close relationship. It has represent ability to the engineering geological conditions of Dianchi lake. Studying Caohai main engineering geological problems is advantageous to the Caohai area engineering construction,has great significance to recognize the engineering geological conditions of Dianchi lake,and has very good guidance function to engineering schemes and measures of Dianchi lake area.
Research conclusions:(1)Caohai engineering geology condition of Dianchi lake is complex,the main engineering geological problems are peat soil,regional major fault and earthquake,the area with high seismic intensity of sand lIIIuefaction and soft soil subsidence,the shallow natural gas and so on .They have a large influence on engineering. (2)The engineering through Caohai can use tunnel and bridge scheme,the tunnel scheme is better by comprehensive comparison. Tunnel construction can use two process of cut and cover method and shield tunneling method,cut and cover method can use two kind of construction methods of cofferdam cut and build island cut,shield tunneling method has minimum impact to natural ecological environmental. (3)The geological conditions of Caohai and Dianchi lake area are similar, have the same engineering geological problem. The road engineering through the Dianchi lake should use shield tunnel scheme. (4)The research results can provide references for underground engineering of soft soil area.
|
Received: 06 January 2014
|
|
|
|
|
[1]刘伟,和佳良,杨文辉,等.昆明轨道交通3号线深基坑 岩土工程勘察与评价[J].铁道工程学报,2012(10): 107-108.
Liu Wei, He Jialiang, Yang Wenhui, etc. The Geotechnical Investigation and Evaluation for Deep Foundation Pit of Kunming Light Rail Transit Line 3 [J].Journal of Railway Engineering Society, 2012 (10) ;107-108.
[2]杨润海,张建国昆明盆地基底断裂反射地震勘探数据处理[J].地震研究,2008(10);380-381.
Yang Runhai, Zhang Jianguo. Reflection Data Processing for Base Faulting in Kunming Basin [J]. Journal of Seismological Research, 2008(10):380- 381.
[3]于更新,楼海,王椿墉,等.昆明市区浅部速度结构与隐伏断裂特征[J].地震学报,2008(9);501-505.
Yu Gengxin, Lou Hai, Wang Chunyong, etc. Shallow Crustal Velocity Structure and Hidden Faults of Kunming City Region[J].Actor Seismologica Sinica, 2008(9);501-505.
[4]王勇.浅层储气砂土的工程效应演化特征与灾变机理研究[D].武汉:中国科学院研究生院(武汉岩土力学研究所),2009.
Wang Yong. Study on Evolution Characteristics of Engineering Effects and the Disaster Mechanism for Shallow Gassy Sand [ D].Wuhan; Graduate University of Chinese Academy of Sciences(Wuhan Institute of Rock and Soil Mechanics),2009.
[5]向道明,张敏,徐恭义.昆明草海大桥桥型方案构思设计[J].桥梁建设,2006(4);27-29.
Xiang Daoming, Zhang Min, Xu Gongyi. Conceptual Consideration and Design of Bridge Type for Caohai Bridge in Kunming[ J].Bridge Construction, 2006 (4: 27-29.
[6]李德宏昆明南连接线草海段方案研究[J].公路,2009 (5) ;253-254.
Li Dehong. Scheme Research on Kunming South Connect Highway Caohai Section[J].Highwa3,2009 (5:253- 254.
|
|
|
|