Abstract Research purposes:The speed of Zhengzhou-Xi'an Passenger Dedicated Line is 350 km/h,when the train passes through a tunnel at high speed,adverse influences of aerodynamics effect on train working, passenger comfort, train performance and the environment at the entrance of the tunnel are obvious. The purpose of the technology study on the two open cut tunnels' connection engineering of Zhengzhou-Xi'an passenger Dedicated Line is to ensure the stability of soil and traffic safety at the entrance,at the same time to avoid the aerodynamics effect influencing the passengers' comfort.
Research conclusions:(1)When the entrance slope of these high speed railway tunnels is very high,and the nearest distance between the entrance of two tunnels is less than 50 m , we suggest that the two should be connected by open cut tunnel. The open cut tunnel is a good technology which has been used in the place of Sanmenxia loess tunnels group and has achieved good results. (2)The technology that needn’t remove the concrete fiber template using in open cut tunnels' of existing high speed railway has achieved good results. It can ensure the safe operation of the line and we should promote the use of it.(3)The results of the research can be promoted and used when increasing open cut tunnel on operating routes.
|
Received: 27 February 2014
|
|
|
|
|
[1 ] TB 10621 —2009,J 971 —2009,高速铁路设计规范[S].
TB 10621—2009,J 971—2009,Code for Design of High Speed Railway [ S].
[2]铁建设[2010] 241号,高速铁路隧道工程施工技术指南 [ S] .
Railway Construction [ 2010 ] No. 241,Construction Code for Tunnel of High Speed Railway [ S].
[3] TB 10020—2012,J1 455—2012,铁路隧道防灾救援疏散工程设计规范[S].
TB 10020—2012,J1 455—2012,Code for Design of Tunnel Disaster Rescue and Evacuation of Railway [ S].
[4]铁建设[2005] 160号,客运专线铁路隧道工程施工质量验收暂行标准[S].
Railway Construction [ 2005 ] No. 160,Interim Code for Passenger Dedicated Railway Tunnel Construction Quality Acceptance Check [ S ].
[5]铁建设[2009] 172号,铁路边坡防护及防排水工程设计补充规定[S].
Railway Construction [ 2009 ] No. 172, Supplementary Provisions for Design of Railway Side Slope Protection and Drainage Engineering [ S].
[6]郑西铁路客运专线有限公司.郑西高速铁路工程总结 [M].北京:中国铁道出版社,2011.
Zhengzhou - Xi' an Passenger Dedicated Railway Line Co. Ltd. Summary of Zhengzhou - Xi'an High - speed Railway Engineering [ M ]. Beijing : China Railway Publishing House,2011.
[7]铁道第三勘察设计院集团有限公司.郑西客运专线工程技术咨询专题报告[R]. 2010.
The Third Railway Design and Survey Institute Group Co. Zhengzhou - Xr an Passenger Dedicated Line Engineering Consulting Report [ R]. 2010.
[8]王林.拱形明洞在短隧道群中洞口高边坡的安全应用 [J].铁道建筑技术,2011 (增)122 - 125.
Wang Lin. Safety Application of Arched Open Cut Tunnel in the Short Tunnel Group During the High Slope [ J ]. Railway Construction Technology,2011 (Suppl) :122-125.
[9]谢新民,邵青.渝怀电气化铁路营业线增减明洞施工技术[J].铁道工程学报,2011(11):81 -87.
Xei Xinmin,Shao Qing. Construction Technique of Constructing Cut - and - cover Tunnel over the Electrifi,d Railway for Chongqing - Huaihua in Operation[ J]. Journal of Railway Engineering Society, 2011(11) :81 -87.
[10]昝爱琴.郑西客运专线黄土隧道半装配式拱形明洞接长施工技术[J].铁道标准设计,2010(z1):118 -119.
Zan Aiqin. Technology for Extensional Construction of Half - assembled Arch - shaped Cut and Cover Hole in Loess Tunnels on Zhengzhou - Xi' an Passenger Dedicated Line [ J ]. Railway Standard Design,2010( z1) 118 -119.
|
|
|
|