|
|
Risk Assessment and Management of Xuefeng Mountain Tunnel No. 1 |
XU Zhan-Bang 1,ZHANG Nai-le 2,ZHOU Zhong-cai 3 , XU Yong-ming l |
1 .The Third Railway Survey and Design Institute Group Corporation , Tianjin 300142,China; 2. China Railway 12th Bureau Group Co. Ltd,Taiyuan,Shanxi 030032,China; 3.Shanghai-Kunming Railway Passenger Dedicated Line Hunan Limited Liability Company,Changsha, Hunan 410008,China |
|
|
Abstract Research purposes:Railway tunnel construction process,due to the complex geological conditions,tunnel construction faces more insecurity factors,especially long tunnel. Xuefeng Mountain Tunnel No. 1 of Changsha to Kunming Passenger Dedicated Line faces many high risk factors,such as landslides,sudden inrush of water and mud, large deformation of surrounding rock. According to grade I risk management,the specific risk control measures and risk management basic system are proposed for the tunnel surrounding rock deformation,landslides,sudden inrush of water, mud and other risks,in order to achieve quality,investment,construction period and other development goals.
Research conclusions:(1)Accurate and complete information is an important basis for the geological survey to identify the risk factors. With the continuous improvement of the tunnel geological survey data, the risk factor identification is gradually deepened,to form a comprehensive,sophisticated risk control measures. (2)Risk assessment of construction drawing stage and construction phase is an important stage of the risk assessment.(3)Risk management of tunnel is a system engineering, organization guarantee is the foundation of risk management success,which depends on the organization and management of design,construction,and construction units. ( 4)Effective implementation of the risk management system will make sure the tunnel safety,quality,investment,construction period and other ground targets of construction projects met successfully. ( 5)The research results can provide a good reference for the risk control and management of high speed railway tunnel.
|
Received: 08 January 2014
|
|
|
|
|
[1]铁建设[2007]200号,铁路隧道风险评估与管理暂行规定[S].
Railway Construction [ 2007]No. 200, Interim Provisions for Risk Assessment and Management of Railway Tunnels [ S].
[2]朱鹏飞,张梅,黄鸿健,等.宜万铁路复杂隧道风险管理与控制[J].铁道标准设计,2010(8);9一11.
Zhu Pengfei, Zhang Mei, Huang Hongjian, etc. Complicated Tunnel on Yichang Wanzhou Railway Risk Management and Control[J].Railway Standard Design, 2010(8) ;9一11.
[3]问玉茹,黄宏伟,胡群芳,等大连湾海底隧道钻爆法施工风险评估研究[J].岩石力学与工程学报,2007 ( S2) ; 3622一3623.
Yan Yuru,Huang Hongwei,Hu Qunfang, etc. Study on the Evaluation of Blasting Construction Risk Dalian Bay Subsea Tunnel Drilling[J].Chinese Journal of Rock Mechanics and Engineering, 2007 ( S2) ; 3622一3623.
[4]陈赤坤,郑长青,曹磊.铁路隧道风险评估体系的研究和探讨[J].铁道标准设计, 2007(S1);12-13.
Chen Chikun, Zeng Changqing, Cao Lei. Research on Evaluation System for Railway Tunnel Risk[J]. Railway Standard Design, 2007 ( Sl) ;12一13.
[5]陈绍华.关角隧道风险评估[J].现代隧道技术,2009 (6);25-26.
Chen Shaohua. Guanjiao Tunnel Risk Assessment[J]. Modern Tunneling Technology,2009(6) ;25一26.
[6]何发亮.铁路隧道风险评估若干问题探讨[J].现代隧 道技术,2011(1);78-80.
He Faliang. Some Problems in Railway Tunnel Risk Assessment[J].Modern Tunneling Technology, 2009 (6) :78一80.
[7]许占良.板岩地层超大断面隧道塌方处理对策[J].铁 道标准设计,2013(3):103一104.
Xu Zhanliang. Treatment of Collapse Countermeasures on the Slate Strata Oversized Section Tunnel[J]. Railway Standard Design,2013(3) ;103一104.
[8]马士伟,梅志荣,张军伟.长大隧道突水突泥灾害的地质 构造量化评价与监测预警[J].现代隧道技术,2009(2): 101一102.
Ma Shiwei, Mei Zhirong, Zhang Junwei. Geological Evaluation and Monitoring of Tunnel Water Gushing Disaster[ J].Modern Tunneling Technology,2009(2): 101一102.
[9]赵勇,刘建友,田四明.深埋隧道软弱围岩支护体系受力 特征的试验研究[J].岩石力学与工程学报,2011 (8) ; 1663一1670.
Zhao Yong, Liu Jianyou, Tian Siming. Experimental Study of Mechanical Characteristics of Support System for Weak Surrounding Rock of Deep Tunnels[J]. Chinese Journal of Rock Mechanics and Engineering, 2011(8);1663一1670.
[10]魏永幸,罗一农,廖淞,等软土地区铁路路基风险评估 与管理研究[J].铁道工程学报,2012(12) :64一65.
Wei Yongxing, Luo Yinong, Liao Song, etc. Risk Assessment and Management of Railway Subgrade in Soft Soil Area[J].Journal of Railway Engineering Society,2012(12) ;64一65.
|
|
|
|