|
|
A NEW METHOD TO DETERMINE THE LENGTH OF TRACK TRANSI?TION SECTION |
WANG Yu1,,ZHAI Wan-ming2, WANG Qi-chang2,LIN Liang-ming1 |
1.Institute of Precision Engineering and Intelligent Microsystem, Shanghai Jiaotong University; 2. Train ﹠ Track Research Institute,Southwest Jiaotong University |
|
|
Abstract After a concise introduction to the track transitions and the theory of vehicle-track cou?pling dynamics,the vehicle/track interactions on the ballast track and ballastless track transition section are systematically analyzed in this paper. The evaluation, indexes are chosen,and a new method, called critical transition scot ion length,is put forward in determine track transition section length.
|
Received: 20 August 1999
|
|
|
|
|
[1]翟婉明.车辆一轨道耦合动力学[M].北京:中国铁道 出版社.1997.
[2]翟婉明.韩卫军.蔡成标等.高速铁路板式轨道动力特 征研究[J].铁道学报,1999,21(6).
[3]王于.轨道过渡段动力学性能分析及设置条件[D]. 成都:西南交通大学列车与线路研究.1999.
[4]HAI Wan-ming. Two simple fast integration methods for large-scale dynamic problems in engineering[J]. International Journal for Numerical Methods in Engineering; 1996,39(24).
[5]王其昌.蔡成标.罗强等.高速铁路路桥过渡段折角限值分析[J].铁道学报.1998.20(3).
|
|
|
|