TECHNIQUES FOR TREATMENT OF DISASTERS IN TIESHAN TUNNEL |
LI Zhi-guo, CAO Zhen-ying |
Tunnel Engineering Bureau of MOR, Luoyang 471009 |
|
|
Abstract The Tieshan Tunnel of Ba-Peng highway is Situated in Dachuan city of Sichuan province with a total length of 2 099 m at 66 northwest of the Tieshan valley- Due to several influence factors, such as the coal mining subsidence, groundwater, weak surrounding rock, etc, disasters occurred in the K14C+ 527~- + 608 section. The disasters in this section included the crack, broken bench cut and rock mass falling of the secondary lining, the bending and shearing break of the reinforcement, and the cracking and leakage of side wall nearby wate channel. These disasters endangered the safety running, the communication was interrupted, and the repairing works were put forward. The repairing methods are introduced mainly in this pa per as follows after reinforcing by grouting for the surrounding rock of the tunnel and its mini ng subsidence region, the secondary lining and its inverted arch, the pavement in serious disaster sections were demolished and the reinforced concrete structures were reconstructed again; in the other hand, the reinforced concrete casing linings were reconstructed for consolidation in general disaster sections.
|
Received: 29 November 1999
|
|
|
|
|
[1]铁山隧道K14C+ 527- 608段施工组织设计[R].隧道工程局科学研究所.1998- 10.
[2]巴彭公路铁山隧道病害整治施工设计图[Z].铁道部第二勘测设计院.1998- 10
[3]四川省达川地区铁山隧道病害区工程地质勘察报告[R]. 四川省煤田地质局一三七队.1998- 10.
[4]铁山隧道病害区K24 K2h K|7_|煤层采空区注浆效果检查 报告[R].四川省煤田地质局一三七队.1999- 06.
[5]铁山隧道K14(+ 527- 608段施工总结[R].隧道工程局科学研究所. 1999- 06. |
|
|
|